Laserfiche WebLink
INTERIM INTERIM <br />Vegemast Engineering, Inc. to update the original plan, and to provide detailed design <br />specifications for those jurisdictions within the Metropolitan Area that did not opt to participate <br />in the first phase. Under the provision allowing the Board to assist local units of government, the <br />Board is underwriting the cost of these design plans. <br />3. Operational Context: <br />The original law creating the Board and the region -wide system required that each county must <br />complete a planning process on whether and how it would participate in the regional system. <br />The plan and any updates or amendments to the plan will serve as the basis for participation. <br />4. Protocol/ Standard: <br />1. Local units of government within the metropolitan area are eligible for aid if <br />a. The governing body of the local unit approves, by resolution, a request for participation <br />in the regional system or requests assistance for constructing capital facilities that the Board <br />determines may be used at some firture time as part of the regional system or a local subsystem of <br />the regional system. <br />b. Funding for the local entity's share of the costs is identified. <br />c. A technical plan for implantation is consistent with the plan developed and approved by <br />the county within which the entity is located and is approved by the governing body of the county. <br />2. Local units of government are eligible for up to a thirty percent reimbursement from the capital <br />bond fund of the Board for the following classes of expenditures and follow the process and <br />procedure outlined in paragraph 5 of this set of standards. <br />Reimbursable capital costs are generally limited to the following: material and personnel costs- <br />involved in civil design and construction at sites, such as site preparation, shelters, towers, roads, <br />easements, and associated elements, including warranties; project management, design, <br />construction and installation of microwave antennas and microwave radio equipment including <br />training and warranties; project management, computer .software, engineering, design and <br />• installation of equipment racks; radio, computer, and other associated equipment permanently <br />mounted or housed in racks and/or in shelters, including training and warranties; antennas and <br />cables; fixed or mobile network monitoring equipment; personnel and material costs of <br />installation of equipment at the dispatch center or control center for the subsystem commonly <br />known as the central electronics bank, equipment designed to facilitate in- building coverage, and <br />associated civil construction at the control center. Not eligible are the costs of portable or mobile <br />radio sets for use on the system nor are the costs of dispatch consoles, except upgrades or <br />purchases that are required to interface with the new 300 MHz system. <br />3. In- building coverage, or any other enhancements, will not be eligible for matching funds for <br />any entity that is a subscriber of a county subsystem unless it is an independent PSAP and <br />recognized and approved as such in the couurty plan. The Board will consider funding in- building <br />6.4 Aid &s Grants to Local Units of Govt. <br />2 Section r <br />