Laserfiche WebLink
FROM :NAC <br />FAX N0. :9525959837 <br />Jun. 04 2003 03:42PM P3/11 <br />HORT atIST *$$OCI*TI.4 CO$$Vi►T*NT$y <br />5775 Wayzata Boulevard, Suite 555, St. Louis Park, MN 55416 <br />Telephone: 952.595.9636 Facsimile: 952.595.9837 plannersOnacpianning. oom <br />MEMORANDUM <br />TO: Little Canada Planning Commission <br />FROM: Stephen Grittman <br />DATE: December 10, 2002 <br />RE: Little Canada - p <br />PUD rywall Supply Rezoning to PUD, Final Plat, Final <br />FILE N0: 758.09 - 02.28 <br />Drywall Supply is amending its original application for the development of the former <br />Knox site by following the City Council's preference that the site be zoned PUD, <br />Planned Unit Development rather than the mix of B -W and 1 -1 with a Conditional Use <br />Permit PUD, The City Council wanted to be sure that the City would still have <br />development control over the site in the event that Drywall Supply abandons its <br />occupancy of the site. The general site plan has been approved for the development, <br />review of the Devtelopment Stage PUD applliication in September, there <br />issues that remain to adequately define the development of the site. These noted in our <br />items listed in our September report: are a number of <br />These include <br />1. Preparation of revised plat and PUD plans detailing a// tend and cover <br />improvements: paving, curbing, buildings, landscaping, <br />2. Preparation of revised plat and PUD plans detailin nt interim improvements <br />that are being proposed pending the development of those areas labeled <br />"future" on the plan, as a part of a PUD phasing plan. <br />3. Compliance with the recommendations made in this report, as well as the <br />engineer's comments. <br />4. Concept PUD approval only should be considered for Lot 1 pending a more <br />defined development plan. Development Stage PUD approval should be <br />considered for Lot 2 and Lot 3, with the understanding that development of <br />the "future" building on Lot 3 will require an amendment to the final PUD. <br />5. The rezoning of the south portion of the property should occur only at the time <br />of final plat approval. <br />