My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-2003 Council Agenda
>
City Council Packets
>
2000-2009
>
2003
>
05-28-2003 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2014 2:41:38 PM
Creation date
6/21/2012 2:13:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WFIEREAS, Schmidt, Sprosty and Kerr consider it mutually desirable to improve their <br />respective properties through the construction of a new swale, which has been recommended by <br />Kerr's surveyor, on a portion of all three properties. A copy of the Site Plan for the construction <br />of said swale is attached hereto and incorporated herein as Exhibit D. <br />WHEREAS, Schmidt, Sprosty, and Kerr have agreed to work together to maintain the <br />swale consistent with all governmental requirements; and, <br />WHEREAS, Little Canada has agreed to assist Schmidt, Sprosty and Kerr in the creation <br />of said swale subject to the execution of this Agreement by Schmidt, Sprosty and Kerr; <br />NOW, THEREFORE, IT IS MUTUALLY STIPULATED AND AGREED• <br />1. PURPOSE. <br />The parties have joined together for the purpose of creating a swale on the Schmidt, Sprosty and <br />Ken properties, for the general improvement of each property to replace the former swale. <br />2. METHOD. <br />Little Canada will apply for and obtain the appropriate watershed permit and any other <br />governmental approvals for excavating said swale. Schmidt, Sprosty and Kerr will be responsible for: <br />ongoing maintenance of said swale. Little Canada will excavate the swale pursuant to the appropriate <br />governmental permits and the Site Plan set forth on Exhibit D. Little Canada's involvement in this matter <br />will merely consist of the movement of existing dirt on the property, the creation of the basin necessary for <br />said swale, the moving the removed fill, the initially seeding the area and the placement of a silt fence. <br />The City will have no easement for the swale and will not be responsible for maintaining it. It is <br />understood and agreed that a portion of a drain tile system that currently exists on the Schmidt property <br />may have to be removed as a result of the digging of the excavation. <br />3. ADEQUACY <br />The parties acknowledge that the swale to be constructed as a result of this Agreement is replacing <br />the previous swale in size and manner of function. No representations are being made that said swale will <br />eliminate flooding in all drainage events. <br />4. ACCESS <br />Schmidt, Sprosty and Kerr shall provide access to Little Canada to their respective properties, to <br />allow for the creation of the hole as described in paragraph 2 herein. This right of access shall include the <br />right of ingress and egress with all machinery, equipment and materials necessary for the aforesaid <br />purposes for Little Canada or their employees, agents, contractors and consultants. <br />2 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.