Laserfiche WebLink
ok Little Canac yo <br />COMMUNITY RIDE <br />1953 — 2009 <br />515 Li le Canada Road, Little Canada, MN 55117 -1600 <br />(651) 766 -4029 / FAX: (651) 766 -4048 <br />wwwci.Jittle -c anada.mn.us <br />MEMORANDUM <br />TO: Mayor Fahey & Members of the City Council <br />FROM: Greg Schroeder, Public Works Director <br />DATE: April 22, 2003 <br />I2.E: Ryan Drive Grading <br />Partial Pay Estimate No.1 (Final) <br />Change orders #1 and #2 <br />�IIiI'MR <br />Michael I. Fahey <br />COUNC/L. <br />Jim laValle <br />Matt Anderson <br />Rick Montour <br />Bill Blesener <br />AD*JINISTRA"J'OR <br />Joel R. Hanson <br />As indicated in our April 18111, 2003 memo, the City Engineer has completed negotiations with <br />the Frattalone Excavating for the grading work associated with the reconstruction of a portion of <br />Ryan Drive. The City Engineer has inspected the work performed by Frattalone Excavating and <br />finds it to be in compliance with the plans, specifications, and contract documents. Change <br />Order No. 1 (attached) includes additional excavation and grading work; additional topsoil; <br />additional soil corrections; and sewing of geotech fabric; additional granular barrow, and <br />addition of a storm sewer in front of Mr. Roger Stanke's property. The storm sewer is needed to <br />drain Ryan Drive and protect the work we have done. The portion of the storm sewer that <br />directly benefits Mr. Stanke's property totals $3,000. Mr. Stanke requested that we bill him <br />directly for this work. Changer Order No. 2, (attached) in the amount of $5,900 is for the <br />disposal of the old contaminated railroad pilings removed from under the roadway. <br />The original contract amount for this grading is $48,256. Adding Change Order No. 1 for <br />$14,045.80 and Change Order No. 2 for $5,900 the final contract amount increases to <br />$68,201.80. Staff recommends City Council approval of Pay Estimate Number 1 (Final) in <br />the total amount of 868,201.80. <br />1- I:AGregSVPay Estimates \Pay Estivate No. 1 (Final) Frnitalone Exeavating 2nd nlanw.doc <br />