Laserfiche WebLink
CPI °f Little Cando, <br />COMMUNITY PRIDE <br />1953 — 2003 <br />515 Little Canada Road, Little Canada, MN 55117 -1600 <br />(651) 766 -4029 / FAX: (651) 766 -4048 <br />www.eilittle-canacia.mn.us <br />MEMORANDUM <br />TO: Mayor Fahey & Members of the City Council <br />FROM: Greg Schroeder, Public Works Director <br />DATE: April 18, 2003 <br />RE: Ryan Drive Grading <br />Partial Pay Estimate No.1 (Final) <br />iyf,! )1. <br />Michael 1. Fahey <br />COUNCIL <br />Jim LaValle <br />Matt Anderson <br />Rick Montour <br />Bi1113tesener <br />ADMINISTRATOR <br />Joel R. Hanson <br />The City Engineer has completed negotiations with the Frattalone Excavating for the grading <br />work associated with the reconstruction of a portion of Ryan Drive. The Ryan Drive Grading <br />Pay Estimate No. 1 (Final) for Frattalone Excavating is only for the excavation and base work. <br />The paving of Ryan Drive was accomplished under a separate contract with Frattalone Paving. <br />The City Engineer has inspected the work performed by Frattalone Excavating and finds it to be <br />in compliance with the plans, specifications, and contract documents. Change Order No. 1 <br />includes additional excavation and grading work; additional topsoil; additional soil corrections; <br />and sewing of geotech fabric; totaling $11,045.80. In addition, Change Order No. 1, includes <br />ditch and grading work for Roger Stanke's property totaling $3,000. Roger Stanke will be billed <br />$3,000 for his portion of Change Order No. 1. Changer Order No. 2, in the amount of $5,900 is <br />for the disposal of the old contaminated railroad pilings removed from under the roadway. <br />The original contract amount for this grading is $48,256. Adding Change Order No. 1 for <br />$14,045.80 and Change Order No. 2 for $5,900 the final contract amount increases to <br />$68,201.80. The final contact documents and staff recommendation will be included in the <br />additions to the agenda. <br />H: \GregS \Pay Estimates \Pay Estimate No. I (Final) Frattalone Excavating.doc <br />