Laserfiche WebLink
B. Summary of the six minimum control measures. Complete items B. 1. through B. 6. <br />Storm Water Pollution Prevention Programs must address the specific requirements contained in Part V. G. of the permit. SWPPPs must <br />outline how the six minimum control measures will be addressed, the contact person, department in charge, timefirame and measures that <br />will be implemented to meet the schedules required by the permit. <br />Public education and outreach measures <br />Schroeder Greg <br />Public Works <br />Contact Last Name First Name Department <br />515 Little Canada RoAD <br />Mailing Address <br />Little Canada <br />MN 55117 <br />City <br />651.766.4049 <br />State Zip Code <br />greg.schroeder@ci.little-canada.mn.us <br />Telephone (include area code) E -Mail Address <br />a) Have Best Management Practices (BMPs) that will be implemented for this minimum <br />control measure been planned or developed? <br />b) Have measurable goals for each BMP for this minimum control measure been planned or <br />developed? <br />c) Has an estimated timeline for implementing each BMP for this minimum control <br />measure been planned or developed? Timelines should include, in narrative or numerical <br />form, the months and years required actions will occur, interim milestones, and <br />frequency of action, as appropriate. <br />d) Have the educational components for this minimum control measure been planned or <br />developed? <br />e) Provide a brief description of the plan to complete any requirements marked "No" above. <br />2. Public participation and involvement measures <br />Schroeder Greg <br />Public Works <br />Yes Olt) <br />Yes ❑No <br />ZYes ❑No <br />®Yes ❑No <br />Contact Last Name <br />515 Little Canada Road <br />First Name Department <br />Mailing Address <br />Little Canada <br />MN 55117 <br />City State Zip Code <br />651.766.4049 greg. schroeder @ci.little - canada.mn.us <br />Telephone (include area code) E-Mail Address <br />a) Have Best Management Practices (BMPs) that will be implemented for this minimum <br />control measure been planned or developed? <br />b) Have measurable goals for each BMP for this minimum control measure been planned or <br />developed? <br />c) Has an estimated timeline for implementing each BMP for this minimum control <br />measure been planned or developed? Timelines should include, in narrative or numerical <br />form, the months and years required actions will occur, interim milestones, and <br />frequency of action, as appropriate. <br />d) Have the educational components for this minimum control measure been planned or <br />developed? <br />Provide a brief description of the plan to complete any requirements marked "No" above. <br />Yes ❑No <br />Yes ❑No <br />Yes ❑No <br />Z Yes ❑No <br />MPCA MS4 Storm Water Permit Application 2 of 8 02/06/03 <br />_7_ <br />