My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-25-2026 Council Packet
>
City Council Packets
>
2020-2029
>
2026
>
02-25-2026 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2026 8:59:25 PM
Creation date
4/8/2026 8:57:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Staff Report <br /> <br /> <br /> <br />To: Mayor Fischer and Members of the City Council <br /> <br />From: Steve Anderson, Parks & Recreation Director <br />Eric Seaburg, City Engineer <br /> <br />Date: February 25, 2026 <br /> <br />Re: Spooner Park Parking Lot Expansion <br /> <br />Action To Be Considered: <br />Motion to approve, table, or deny the following: <br />• Approve plans and authorize bidding for the Spooner Park parking lot expansion. <br /> <br />Background: <br />The upper parking lot at Spooner Park currently provides 30 stalls. Shelter rentals and park events <br />routinely fill this lot, and with on‑street parking restrictions in place, visitors often need to use the <br />overflow lot located east of the ballfield. <br /> <br />The 2026–2035 Capital Improvement Plan (CIP) includes funding in 2026 to expand the upper <br />parking lot to better accommodate park users. As shown in the attached plan sheet, the expansion <br />will result in a net increase of 22 stalls. In preparing the layout, staff worked to maximize the <br />number of new stalls while minimizing impacts to the existing lot and preserving nearby mature <br />trees. The project also includes a proposed trail extension connecting the expanded lot to the <br />existing trail system, as well as a new light fixture to illuminate the additional stalls. $165,000 was <br />budgeted for in the CIP (Parks 12) for the parking lot expansion project. <br /> <br />Canadian Days: <br />With many projects involving Spooner Park, staff have collaborated closely with the Canadian Days <br />organizers. Canadian Days supports the parking lot expansion and has requested additional <br />electrical upgrades necessary for the annual event. They have generously committed a $40,000 <br />contribution toward the electrical work; however, initial engineering estimates have come in <br />significantly higher than originally expected. Estimates have been submitted conservatively, and <br />staff hope to secure a lower bid cost for the electrical upgrades. These improvements will be tracked <br />and itemized separately as part of the overall project. <br /> <br />Project Timeline: <br /> <br />Approve Plans and Authorize Bidding February 25, 2026 <br />Bids Due March 18, 2026 <br />Award Project March 25, 2026 <br />Construction, Restoration, & Completion May 1 – June 30 <br />* Project timeline contingent on weather. <br />
The URL can be used to link to this page
Your browser does not support the video tag.