My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-25-2026 Council Packet
>
City Council Packets
>
2020-2029
>
2026
>
03-25-2026 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2026 9:03:43 PM
Creation date
4/8/2026 9:00:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPN ARCHITECTS + <br />CITY OF LITTLE CANADA 3 <br />Project Team & Key Personnel <br />As a staff of more than 100, OPN has the capacity to undertake this project. The chart below demonstrates our continuity and availability of the <br />assigned staff in every phase of the project. This work will be a priority for us throughout the proposed duration for design through construction. <br />Available resources 70+25+5AVAILABLE <br />25%UNDER <br />CONTRACT <br />70% <br />OPN MINNEAPOLIS <br />2026 PROJECTED <br />VOLUME OF WORK <br />STAFF INVOLVEMENT BY PHASE <br />JOE, PRINCIPAL-IN-CHARGE EMMIE, INTERIOR DESIGNERNICK, PROJECT MANAGER <br />COMMUNITY ENGAGEMENT <br />SCHEMATIC DESIGN <br />CONCEPT VALIDATION <br />DESIGN DEVELOPMENT <br />CONSTRUCTION ADMIN. <br />CONST. DOCUMENTSArchitectureOPN ARCHITECTSProject Architect <br />Nick Woods, AIA <br />Principal-In-Charge <br />Joe Wallace, AIA <br />Client Point of Contact <br />Performance Director <br />Rebecca Riss, LEED AP <br />BD+C, LEED AP ID+C, SITES <br />AP, WELL AP, CPHC <br />Registered Interior Designer <br />Emmie Brady, NCIDQ MEP Engineering EMANUELSON- PODASElectrical Engineer <br />Kelly Artz, PE, RCDD, <br />LEED AP BD+C, WELL AP <br />Mechanical Engineer <br />Scott Vander Heiden, <br />PE, LEED AP B+C <br />Structural EngineeringMEYER BORGMAN JOHNSONStructural Engineer <br />Lindsey Lyrenmann, PE, SE <br />Lead Engineer <br />J.W. Murphy Curran, PE, SE Cost EstimatingROCKWISESenior Cost Consultant <br />Talon DeWitzLandscape Architecture & Civil EngineeringBOLTON & MENKLandscape Architect <br />Project Manager <br />Anna Springer, PLA, ASLA <br />Senior Project <br />Landscape Architect <br />Lance Schuer, PLA <br />LITTLE CANADA <br />COMMUNITY BUILDING <br />5%
The URL can be used to link to this page
Your browser does not support the video tag.