Laserfiche WebLink
ASSESSMENT POLICY <br />❑ Street <br />• Assess at the Commercial Rate <br />• 80% of City Project Cost <br />• 0% of Storm Sewer Cost <br />• 100% of Concrete Curb and Gutter Cost <br />➢ Assessment Based on Actual Front Footage <br />➢ Commercial Rate = $95.00 per front foot maximum <br />(Increased from 2002 rate due to construction cost inflation) <br />❑ Sanitary Sewer <br />➢ No Assessment for Relocation or Repair of Existing Lines <br />