Laserfiche WebLink
PAR33106.xis <br />RAMSEY COUNTY PUBLIC WORKS <br />Traffic Services <br />Cvri TRACT WORK <br />RICE ST & SOUTH OWASSO BLVDSYSTEM A <br />INCLUDES INTERCONNECT AND RIGHT TURN LANES <br />CON 33106 <br />PARTICIPATION COSTS <br />RASED ON I OW 1310 BY FRATTAI ONF <br />PARTICIPATION <br />ITEM NO. <br />ITEM <br />UNIT <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />UNIT <br />PRICE <br />TOTAL <br />AMOUNT <br />RAMSEY COUNTY <br />GROUP 1 <br />CITY - LITTLE CANADA <br />SAP 200 -102 -04 <br />GROUP 2 <br />CITY.ROSEVILLE <br />SAP 60-252 -01 <br />GROUP 3 <br />QUANT. <br />AMOUNT <br />QUANT. <br />AMOUNT <br />QUANT. <br />AMOUNT <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />1 <br />518,400.00 <br />518.400,00 <br />0.69 <br />512.696,00 <br />0.17 <br />53,128.00 <br />0.14 <br />52.57600 <br />2102.501 <br />PAVEMENT MARKING REMOVAL <br />S.F <br />625 <br />51,65 <br />51,031.25 <br />492.00 <br />5811.80 <br />133,00 <br />5219.45 <br />0.00 <br />30.00 <br />2104.501 <br />REMOVE 12' STORM SEWER PIPE <br />L.F. <br />12 <br />525.00 <br />5300.00 <br />12.00 <br />5300.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2104.501 <br />REMOVE CURB & GUTTER <br />L.F. <br />1196 <br />51.85 <br />52,212.60 <br />1040.00 <br />51,924.00 <br />156,00 <br />5288.60 <br />0.00 <br />50.00 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />S.Y <br />74 <br />55.50 <br />5407,00 <br />51.00 <br />5280.50 <br />23.00 <br />5126.50 <br />0.00 <br />50.00 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />L.F. <br />140 <br />55.25 <br />5735.00 <br />120.00 <br />5630.00 <br />20.00 <br />5105.00 <br />0.00 <br />5000 <br />2104.509 <br />REMOVE CATCH BASIN <br />EACH <br />1 <br />5140.00 <br />5140.00 <br />1,00 <br />5140.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2104.509 <br />REMOVE SURFACE DRAIN <br />EACH <br />2 <br />5140.00 <br />5280.00 <br />2.00 <br />5280.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2105.501 <br />COMMON EXCAVATION <br />C.Y. <br />1540 <br />59.50 <br />514.630.00 <br />1440.00 <br />513080.00 <br />100.00 <br />5950.00 <br />0.00 <br />50.00 <br />2105.522 <br />SELECT GRANULAR BORROW (LV) <br />C.V. <br />1058 <br />512.50 <br />513.22500 <br />1010.00 <br />512,625.00 <br />48.00 <br />5600.00 <br />0.00 <br />50.00 <br />2105.526 <br />SELECT TOPSOIL BORROW (LV) <br />C.Y. <br />155 <br />514,50 <br />52.247.50 <br />143.00 <br />52.07350 <br />12.00 <br />5174.00 <br />0.00 <br />50.00 <br />2130.501 <br />WATER (M) <br />GAL (M) <br />10 <br />530.00 <br />5300.00 <br />8.00 <br />5240.00 <br />2.00 <br />560.00 <br />0.00 <br />50.00 <br />2211.503 <br />AGGREGATE BASE. CLASS 6 (CV) <br />C.Y. <br />239 <br />522.10 <br />55,281.90 <br />213.00 <br />54,707.30 <br />26.00 <br />5574.60 <br />0.00 <br />50.00 <br />2232.501 <br />MILL BITUMINOUS SURFACE, 2' DEPTH <br />S.Y. <br />722 <br />53.85 <br />52,779.70 <br />589.00 <br />52.267.65 <br />133.00 <br />5512.05 <br />0.00 <br />50.00 <br />2340.508 <br />TYPE 47 WEARING COURSE MIXTURE <br />TON <br />141 <br />552.65 <br />57,423,65 <br />135.00 <br />57.107,75 <br />6.00 <br />5315.90 <br />0.00 <br />50.00 <br />2340.508 <br />TYPE 41 WEARING COURSE MIXTURE <br />TON <br />32 <br />564.75 <br />52,072.00 <br />27.00 <br />51,748,25 <br />5.00 <br />5323.75 <br />0.00 <br />50.00 <br />2340.510 <br />TYPE 47 BINDER COURSE MIXTURE <br />TON <br />141 <br />551.60 <br />57,275.60 <br />135.00 <br />56,966.00 <br />6.00 <br />5309.60 <br />0.00 <br />50.00 <br />2340.510 <br />TYPE 31 BINDER COURSE MIXTURE <br />TON <br />32 <br />563.75 <br />52,040.00 <br />27.00 <br />51721.25 <br />5.00 <br />5318.75 <br />0.00 <br />50.00 <br />2340.514 <br />TYPE 31 BASE COURSE. MIXTURE <br />TON <br />132 <br />550.55 <br />56,672,60 <br />122.00 <br />56,167.10 <br />10.00 <br />5505.50 <br />0.00 <br />50.00 <br />2357.502 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GAL <br />149 <br />53.00 <br />5447.00 <br />135,00 <br />5405.00 <br />14.00 <br />542.00 <br />0.00 <br />50.00 <br />2502.541 <br />4' PERFORATED P. E. PIPE DRAIN <br />L.F. <br />560 <br />55.00 <br />52,800.00 <br />560.00 <br />52,800.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2503.541 <br />IT RC PIPE SEWER, 0E5 3006 CL. V <br />L.F. <br />44 <br />535.00 <br />51,540.00 <br />44.00 <br />51,540.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2504.602 <br />RELOCATE HYDRANT <br />EACH <br />2 <br />51.750,00 <br />53,500.00 <br />2.00 <br />53.500.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2504.602 <br />ADJUST VALVE BOX <br />EACH <br />2 <br />5150.00 <br />5300.00 <br />2.00 <br />5300.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2506.502 <br />CONSTRUCT DRAINAGE STRUCTURE. DES. AOR F <br />EACH <br />2 <br />51,000.00 <br />52,000.00 <br />2.00 <br />52.000,00 <br />0.00 <br />50.00 <br />0.00 <br />5000 <br />2506.502 <br />CONSTRUCT DRAINAGE STRUCTURE, DES. C OR G <br />EACH <br />2 <br />51.250,00 <br />52,500.00 <br />2.00 <br />52,50000 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2506.511 <br />RECONSTRUCT MANHOLE <br />L.F. <br />6.3 <br />5215.00 <br />51.354,50 <br />6.30 <br />$1,354,50 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2506.516 <br />CASTING ASSEMBLY <br />EACH <br />3 <br />5350.00 <br />51.050,00 <br />3.00 <br />51,050.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2506,522 <br />ADJUST FRAME AND RING CASTING <br />EACH <br />1 <br />5200.00 <br />5200.00 <br />1.00 <br />5200.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2531.501 <br />CONCRETE CURB & GUTTER. DES. 6624 <br />L.F. <br />1154 <br />510.15 <br />511,713.10 <br />998.00 <br />510,129.70 <br />156.00 <br />51,583.40 <br />0.00 <br />50.00 <br />2531.602 <br />CONCRETE PEDESTRIAN RAMP <br />EACH <br />4 <br />5845.00 <br />53,380.00 <br />4.00 <br />53.380.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />1 <br />53,67500 <br />53.675.00 <br />0.69 <br />52,535.75 <br />0.17 <br />5624.75 <br />0.14 <br />5514.50 <br />2564.602 <br />PAVEMENT MESSAGE (LEFT AROW) EPDXY <br />EACH <br />4 <br />5120.00 <br />5480.00 <br />4.00 <br />5480.00 <br />0.00 <br />50.00 <br />0.00 <br />30.00 <br />2564.602 <br />PAVEMENT MESSAGE (RIGHT ARONO EPDXY <br />EACH <br />6 <br />5130.00 <br />5780.00 <br />700 <br />5520.00 <br />2.00 <br />5260.00 <br />0.00 <br />5000 <br />2564.603 <br />4' SOLID LINE WHITE-EPDXY <br />L.F. <br />890 <br />50.60 <br />5534,00 <br />790.00 <br />5474,00 <br />100.00 <br />560.00 <br />0.00 <br />50.00 <br />2564.603 <br />4' DOUBLE SOLID LINE YELLOW-EPDXY <br />L.F. <br />675 <br />51.25 <br />5843.75 <br />500.00 <br />5625.00 <br />175.00 <br />5218.75 <br />0.00 <br />50.00 <br />2564.604 <br />ZEBRA CROSSWALK WHITE -EPDXY <br />S.F <br />705 <br />54.30 <br />53.031.50 <br />705.00 <br />53,031,50 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2573.502 <br />SILT FENCE, TYPE HEAVY DUTY <br />L.F. <br />1141 <br />53.00 <br />53.423.00 <br />999.00 <br />52,997.00 <br />142.00 <br />5426.00 <br />0.00 <br />50.00 <br />2575.505 <br />SODDING, TYPE LAWN <br />S.Y. <br />1408 <br />52.45 <br />53.449.60 <br />129700 <br />53,177.65 <br />111.00 <br />5271.95 <br />0.00 <br />50.00 <br />2575.532 <br />COMMERCIAL FERT., ANALYSIS I0 -20.20 <br />POUND <br />73 <br />51,25 <br />591.25 <br />67.00 <br />583.75 <br />6.00 <br />57.50 <br />0.00 <br />50.00 <br />2564.531 <br />SIGN PANELS TYPE 0 <br />S.F. <br />42 <br />528.60 <br />51,201.20 <br />4200 <br />51,201.20 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2565.511 <br />FULL T. ACT. T. CONTROL SIGNAL SYSTEM A <br />SIG. SYS. <br />1 <br />5156.500.00 <br />5156.500,00 <br />0.50 <br />578.250,00 <br />0.25 <br />539.125,00 <br />0.25 <br />539.125.00 <br />2565.601 <br />EMERGENCY VEHICLE PREEMPTION SYSTEM A <br />L. SUM <br />1 <br />55,20000 <br />55,200.00 <br />0.00 <br />50.00 <br />0.50 <br />52.600,00 <br />0.50 <br />52.600.00 <br />2565.602 <br />PVC HANDHOLE (INTERCONNECT) <br />EACH <br />4 <br />5755.00 <br />53,020.00 <br />4.00 <br />53.020.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2565.603 <br />2' NON-METALLIC CONDUIT (INTERCONNECT) <br />L.F. <br />1134 <br />59.50 <br />510.773.00 <br />1134.00 <br />510773,00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2565.603 <br />610 FIBER OPTIC (INTERCONNECT) <br />L.P. <br />2078 <br />53.25 <br />56,753.50 <br />2078.00 <br />56,753.50 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />TOTAL 5317,994.20 <br />Suer 5219,447.65 <br />SUET. 553,731.05 <br />SUB T. $44,815.50 <br />Engineering & Inspection (6Y) 53,223.86 <br />G and Total 556,954.91 <br />Page 42 <br />52,688.93 <br />547,504.43 <br />