Laserfiche WebLink
Code /Life /Safety /Basic Improvements Costs <br />If Public Works stays in existing building and we do not increase the floor area? <br />Per the Oertel report we would need to address the following: <br />Code: <br />Upgrade HVAC System: $60,000 <br />Monitoring Improvements: $ 2,000 <br />Separation of Vehicles /staff: $ 5,000 <br />Women's Restroom and lockers: $18,000 <br />Upgrade Men's room: $ 3,000 <br />Electrical improvements: $ 4,000 <br />Welding improvements: $ 2,000 <br />Life /Safety: <br />Fire protection improvements: $15,000 <br />Vehicle wash screen: $ 3,500 <br />Upgrade overhead door width: $30,000 <br />Soft Costs: $ 7 500 (varies) <br />Total $150,000 <br />If Public Works stays in existing building and increase the floor area 3,000 s.f.? <br />Per the Oertel report we would need to address the following: <br />Upgrade HVAC System: $60,000 <br />Monitoring Improvements: $ 2,000 <br />Separation of Vehicles /staff: $ 5,000 <br />Women's Restroom and lockers: $18,000 <br />Upgrade Men's room: $ 3,000 <br />Electrical improvements: $ 4,000 <br />Welding improvements: $ 2,000 <br />Vehicle wash screen: $ 3,500 <br />Upgrade overhead door width: $30.000 <br />Subtotal $127,500 <br />3,000 s.f. expansion *: $180,000 <br />Covered Storage: $ 20,000 <br />Special site costs: $ 14,000 <br />Sitework, demo: $ 35,000 <br />Gas Tanks: $100,000 <br />Salt storage: $ 20,000 <br />Soft Costs: $ 50.000 <br />Subtotal $419,000 <br />Grand Total $546,500 <br />*Includes Fire Sprinkler System <br />If we sell the Public Works building? <br />Per discussions with the Fire Marshall, Building Inspector, and City Planner, we would <br />not be require to make any of the Code /Life /Safety/Basic corrections to the building. <br />Page 3 <br />