My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-24-2001 Council Agenda
>
City Council Packets
>
2000-2009
>
2001
>
10-24-2001 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 1:25:51 PM
Creation date
6/25/2012 1:24:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br />ROOF SYSTEM EVALUATION <br />This phase involves the physical review of the roof areas, and the development of a report <br />containing the information obtained. <br />Prior to performing the review, the owner provides to Roof Spec, Inc., the history of the subject <br />roof areas to the best of their knowledge, and any additional documents and reports relative to <br />the subject buildings. <br />Based on this information, and that which is obtained within the review, Roof Spec, Inc. will <br />provide a written report outlining the following: <br />A) Historical data or background information as supplied by the owner or obtained via the <br />physical review of the roof assemblies by Roof Spec, Inc. personnel. <br />B) Field observations of anomalous conditions within the roof assemblies with photographs <br />highlighting deficiencies observed; roof plans and pertinent details relative to the distress <br />and/or locations of moisture infiltration. <br />C) Conclusions as to the causes of distress within the roof assembly in combination with <br />appropriate recommendations for cost effective maintenance procedures and /or <br />replacement. <br />D) Projected budget costs and prioritization schedules pertaining to those areas having the <br />greatest need for repair and/or replacement. <br />ESTIMATED COST: <br />$700.00 <br />We would anticipate performing our review within three weeks of receiving the <br />• executed Authorization to Proceed. <br />Page 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.