Laserfiche WebLink
SEP -21 -2001 12:48 <br />HOWARD R. GREEN P.03'04 <br />FINAL PAYMENT <br />PROM: AIJGUST1,2001 <br />To: SEPTEMBER 21. 2001 <br />CONTRACTOR: GREAT WESTERN CCORPORATECt4 <br />ADORES& 8101 OCARINA TRAIL <br />FOREST LAKE, MN 55025 <br />CWIEM CRY OP unix CANADA, NN <br />PRWECT. COUNTY ROAD B AND OIANNAUWE UFT STATION M001PRCATIONS <br />COMPLETION DATE <br />ORIGINAL: JUNE 13, 2001 <br />REIAa SEPTEIMCR 21, 200 <br />AMOUNT OF CONTRACT. <br />ORIGINAL 597,110.00 <br />REVISED: $59,402.14 <br />Sat!n4Ar'LO -COURY ROADt 51*TIO N <br />1 MOW1.74A1 PUNn rnuArevu4 SITEWOOXINCLUOINO are <br />CLEARING <br />2 DEWATERING FOR CONSTRUCTION OF WET WELL STRUCTURE <br />3 NEW 72• DI& CONCRETE WET NTLL STRUCTURE <br />OEMODUON or EXISTING UPT STATION INCLUDING THE <br />4 REMOVAL OF PIPING, VALVES, PUMPS, CONTROLS WET WELL, <br />AND ORY W61 STRUCTURE <br />LS 1 54000.00 0.00 50.00 1.00 55,00010 <br />LS 1 59,100.00 0.00 50.00 1.00 49,10000 <br />1.6 1 513.73010 0.00 50.00 1.00 513,750.00 <br />18 1 511,050,00 0.00 50.00 1.00 311,050.00 <br />3 8. SANEARY SENIOR REMOVAL LS 1 51,30¢00 0.00 50.00 1.00 51,500.00 <br />0 NEW FORCEMAIN PIPING INCLUDING PIPE BEDDING AND l8 7 $3.900.00 0.00 5¢00 1.00 *7,900.00 <br />CONNECTION TO EXISRNG FORCEMAIN <br />8 <br />NEW GRAVITY SEWER INCLUDING CONNECTION TO EXISTING <br />LS 1 54,600,00 ¢DO 50.00 1.00 51,550.00 <br />SEWER AND PIPE BEDDING <br />INSTAUATON 00 OWNER FURNISHED DUPLEX FACTORY-BUILT <br />SUBMERSIELEPUMP STATION INCLUDING NON-CLOG PUPLW <br />SUBMERSIBLE P1R.IPINGS, DISCHARGE CONNECTION, ACCESS <br />COVER BUBBLER SYSTEM, CONTIWL PANS, OTHER RELATED <br />CONTROL ACCESSORIES, AND WEATHER PROOF FIBERGLASS <br />ENCLOSURE <br />LS 1 53,000.00 0,00 50.00 1.00 53,900,00 <br />UFT STATION PIPING, FITTINGS, GUIDE AJL SYbI FIA AND 60SC. <br />9 ITEMS NOT INCLUDED N FACTCRYMULT PUMP STATION LS 1 57,500.00 0.00 5¢00 1.00 $7,500.00 <br />PACKAGE <br />10 <br />11 <br />ELECTRICAL, INCLUDING INSTALLATION OF OWNER FURNISHED <br />S%ran% ENTRY EOUFMPNT <br />SEWAGE EYPASS SYSTEM PICLUI NG TEMPORARY GRAVEN <br />AND PORCBNIIN PIPING <br />12 6'HGN CHAINUNK FENCE AND 10' DOUBLE GATE <br />T SCHEDULE 1.0 • COUNTY ROAD E LIFT STATION -TOTAL <br />2 <br />SCNFMUR IID -DIM 4A LANG LIFT STATION <br />MOBILIZATION:MISCELLANEOUS SITE WORK INCLUDING SLT6 <br />CLEARING <br />REMOVE EXJSTR4GUFTSTATION RRNG, VALVES, PUMPS, AND <br />CONTROLS <br />3 CONNECT TO DOSTINGFORCEMAIN <br />x415NAl P2TR111 st <br />18 1 5400010 0.00 50.00. 1.00 *5,000.00 <br />13 1 *9200.00 0,00 50.00 1.00 56,200.00 <br />18 1 52,600.00 0.00 50.00 1.00 5280060 <br />50.00 585.060.00 <br />LS 1 52,000.00 400 50.00 1.00 5200000 <br />LS 1 52,e0O10 0.00 10.00 1.00 5260000 <br />LS 1. 5760.00 0.00 30.00 1.00 5700.00 <br />Page 77 <br />