My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-21-2000 Council Agenda
>
City Council Packets
>
2000-2009
>
2000
>
11-21-2000 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2012 1:46:05 PM
Creation date
6/26/2012 1:43:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c1+ 95et/ Wiseeek <br />MAYOR <br />Michael I. Fahey <br />COUNCIL <br />Beverly Scalze <br />Jim LaValle <br />Steve Moreton <br />Bob Pedersen <br />515 Little Canada Road, Little Canada, MN 55117 -1600 ADMINISTRATOR <br />(651) 484 -2177 / FAX: (651) 484 -4538 Joel R. Hanson <br />Email: cityhall @ci.little- canada.mn,us <br />MEMORANDUM <br />TO: Planning Commission <br />FROM: Greg Schroeder, Public Works Director <br />DATE: November 1, 2000 <br />RE: Frattalone PUD Concept Review <br />31xx Spruce Street <br />I have reviewed the concept drawing for the proposed shop and 2 -story office building PUD at <br />31xx Spruce Street and offer the following: <br />➢ City Water <br />There is a 12" dip in the Spruce Street right -of -way adjacent to this property. No <br />service stubs are shown on our maps, therefore, the applicant would have to connect <br />directly to our main. <br />➢ Sanitary Sewer <br />Metropolitan Council has a 36" diameter RCP sanitary sewer interceptor line that <br />follows the east right -of -way line at Spruce Street that could be connected to. The <br />applicant is advised to apply for a connection to this interceptor line a minimum of 4 <br />weeks in advance to allow time for the needed approvals. <br />➢ Spruce Street <br />Spruce Street in general is in good condition. It was built to a 9 ton standard, but is <br />starting to show its age. Truck traffic to and from the proposed site during site <br />excavation has damaged the edge at their street entrance. This needs to be repaired. <br />➢ Storm Water <br />Blacktern Pond does not have a defined outlet. Therefore, caution should be used if <br />directing storm water to this pond. <br />Connection to the Spruce Street storm water system will require hydraulic <br />calculations to ensure the system is not being over loaded. Ramsey - Washington <br />Metro Watershed District approval should be obtained for this project. <br />H ^Jessical \Greg S \Streets\Spruce PUD concept reviewdoc <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.