Laserfiche WebLink
MAYOR <br />Michael L Fahey <br />COUNCIL <br />Beverly Scalze <br />Jim LaValle <br />Steve Morelan <br />Bob Pedersen <br />515 Little Canada Road, Little Canada, MN 55117 -1600 ADMINISTRATOR <br />(651) 484 -2177 / FAX: (651) 484 -4538 Joel R. Hanson <br />Email: cityhall @ci.little- canada.mn.us <br />MEMORANDUM <br />TO: Mayor Fahey & Members of the City Council <br />FROM: Greg Schroeder, Public Works Director <br />DATE: October 5, 2000 <br />RE: Little Canada Road Update <br />➢ Construction Update <br />Due to the continued great weather, this project is proceeding along quite well. The <br />contractor has completed all of the water, sanitary sewer, storm sewer, and sub cut work. <br />They are placing the gravel base material and we expect the concrete curb and gutter to be <br />installed the week of October 9th. The first lift of bituminous pavement is scheduled to be <br />placed the end of the week of October 16tH <br />The Canadian Pacific Railroad (CP Rail) has started installing the new railroad crossing. <br />This crossing should be completed by October 10th. This was a surprise that they showed up <br />this fall based on previous information. While it is good the work will be done, it caused <br />some unexpected inconvenience by shutting down the crossing, especially to the school <br />district. <br />• Pond Aeration <br />We have been in contact with a company that specializes in the installation of pond <br />aeration/fountains. They have prepared a quote with three options (see attached). We are <br />also seeking electrical installation costs. (We hope to have this information by Wednesday <br />night's meeting.) Electrical costs could push installation to over $7500 if lights are installed. <br />➢ Newsletter <br />Attached for your information is a copy of the newsletter that was given to all business and <br />residential properties affected by this project. <br />H:VessicaJ \ Agenda \October 6 \LC: Road Update.doc <br />Page 34 <br />