My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-22-2000 Council Agenda
>
City Council Packets
>
2000-2009
>
2000
>
03-22-2000 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2012 11:03:05 AM
Creation date
6/27/2012 10:54:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 18, 1999 <br />Mr. Gerald Urban <br />City of Vadnais Heights <br />687 East County Road F <br />Vadnais Heights, MN 55127 -7099 <br />Dear Mr. Urban: <br />EXHIBIT C <br />'1EA CANE X0 CZYTER. 57: PALL. AW:517Q 65f .50-•T00 BOO 3t-N2OS5 <br />• ENGINE✓i1NO • ENVIRONMENTAL • MANSPORTAT7CN <br />RE: Vadnais Heights, Minnesota <br />Water System Plan Update <br />SEE No. A- VADNA9911.O0 <br />This Ietter is in regard to the April 23, 1999 lett= to the Mayor, Honorable Susan Banovetz, from <br />the Mayor of the City of Little Canaria Honorable Michael L Fahey. In his letter. Mayor Fahey <br />advised that the City of Little Canaria would support the extension of the Vadnais Heights water <br />system to serve the residents of Little Canada in the Twin Lakes area. He requests that this portion <br />of Little Canada be included in the Study for the Water System for Vadnais Heights. If a looped <br />system through this area is feasible from a physical and finanriai standpoint, the City of Little <br />Canada is prepared to initiate the public improvrmMr process with their residents. <br />Following is a breakdown of costs to include this portion of Little Canaria in the Comprehensive <br />Water Study. <br />Work Task Atnotmt <br />1. Hydraulic Analysis of Distribution System. $1.700 <br />Description Hours <br />Chem Manager <br />Project Manager 3 <br />Project Engineer 10 <br />Technician 4 <br />Word Processor 1 <br />2. Storage Requirements including Fire Plows <br />Description Hours <br />Client Manager 1 <br />Project Manager 2 <br />Projern Engineer 2 <br />Technician 1 <br />Word Fronts. 0 <br />$550 <br />3_ Water Quality Analysis and Treatment AIteaatives 50 <br />sb+CRTELUOTr <br />H 1VtP1acSCN INC. MIfinear S.AW StCOUA. MN C711PFEYA FALL% M M4015tM M LAKE COUNTY. IN <br />EOUM. CFPOArrLWJY'E34i.0YE } t <br />page 170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.