Laserfiche WebLink
ITEM <br />NO. <br />1 <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE <br />THIS PERIOD. <br />QTY. TOTAL PRICE <br />TOTAL TO DATE <br />QTY. - TOTAL PRICE <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />6 <br />2232.501 <br />MILL BITUMINOUS PAVEMENT <br />SY <br />240D <br />510.30 <br />0.00 <br />5000 <br />0.00 <br />5000 <br />7 <br />2331604 <br />FULL DEPTH RECLAMATION <br />SY <br />1435.00 <br />5129 <br />1435.00 <br />51,851.15 <br />50.00 <br />1,435.00 <br />0.00 <br />51851.15 <br />5000 <br />8 <br />2350.501 <br />TYPE MV4 WEAR COURSE MIXTURE <br />TON <br />14000 <br />576.00 <br />0.00 <br />9 <br />2350.501 <br />TYPE LV3 NON WEARING COURSE MIXTURE (BASE) <br />SILT FENCE, TYPE MACHINE SLICED <br />TON <br />LF <br />180.0D <br />60.00 <br />576.00 <br />5285 <br />0.00 <br />2000 <br />50.0D <br />557,00 <br />0.00 <br />20.00 <br />5000 <br />557.00 <br />10 <br />2573.502 <br />11 <br />257353 <br />INLET PROTECTION (WIMCO) <br />EACH <br />100 <br />5165.00 <br />0.00 <br />50.00 <br />0.00 <br />5000 <br />12 <br />2575.504 <br />SEEDING (TYPE 270) <br />SY <br />475.00 <br />5361 <br />00D <br />50.00 <br />0.00 <br />5000 <br />13 <br />2582.501 <br />PAVEMENT MESSAGE (HANDICAP SYM) - EPDXY <br />EACH <br />2.00 <br />5231.75 <br />000 <br />50.00 <br />000 <br />50.00 <br />14 <br />2582.502 <br />4" SOLID WHITE LINE - EPDXY <br />LF <br />720.00 <br />53.09 <br />0.00 <br />50.00 <br />000 <br />5000 <br />15 <br />SPEC <br />DENSITY TEST. IN PLACE <br />EACH <br />1.00 <br />582.40 <br />0.00 <br />50.00 <br />0.00 <br />50 OD <br />16 <br />SPEC <br />NUCLEAR BITUMINOUS DENSITY <br />EACH <br />6.00 <br />625.75 <br />0.00 <br />5000 <br />0.00 <br />50.00 <br />17 <br />SPEC <br />EXTRACTION/GRADATION <br />EACH <br />2.00 <br />5123.60 <br />000 <br />50.00 <br />000 <br />6000 <br />18 <br />SPEC <br />AIR VOIDS <br />EACH <br />2.00 <br />5123.60 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />SCHEDULE 6.0- SPOONER PARK -TOTAL <br />510,744.67 510.74467 <br />SCHEDULE 7.0 - PEDESTRIAN CURB RAMPS <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.00 <br />5800.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />2 <br />2521.501 <br />4" CONCRETE PAVEMENT <br />SY <br />10.00 <br />543.26 <br />0.00 <br />50.00 <br />0.00 <br />60.00 <br />3 <br />2531.602 <br />PEDESTRIAN CURB RAMP <br />EACH <br />1.00 <br />592700 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />4 <br />2531.602 <br />PEDESTRIAN CURB RAMP (COLORED) <br />EACH <br />5.00 <br />51.339.00 <br />0.00 <br />50.00 <br />0.00 <br />500D <br />5 <br />2531.618 <br />TRUNCATED DOMES <br />SF <br />56.00 <br />53108 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />SCHEDULE 7.0 - PEDESTRIAN CURB RAMPS - TOTAL 50.00 50.00 <br />BID SUMMARY <br />SCHEDULE 1.0- ROSEWOOD DRIVE - TOTAL <br />SCHEDULE 2.0- PARK STREET - TOTAL <br />SCHEDULE 3.0- SPRUCE STREET - TOTAL <br />SCHEDULE 4.0 - SYLVAN STREET - TOTAL <br />SCHEDULE 5.0 - FIREHALL PARKING LOT - TOTAL <br />SCHEDULE 6.0- SPOONER PARK -TOTAL <br />SCHEDULE 7.0 - PEDESTRIAN CURB RAMPS - TOTAL <br />TOTAL BID SUMMARY THIS PERIOD <br />TOTAL BID SUMMARY TO DATE <br />THIS PERIOD <br />51,85297 <br />55,217.64 <br />53,069.39 <br />51,607.35 <br />52,387.54 <br />510,744.67 <br />50.00 <br />524,879.56 <br />TOTAL TO DATE <br />AMOUNT EARNED <br />AMOUNT RETAINED <br />MATERIAL ON SITE <br />MATERIAL DEDUCT. <br />PREVIOUS PAYMENTS <br />AMOUNT DUE <br />TOTAL THIS <br />529.879 56 <br />51093.98 <br />50.00 <br />6000 <br />523,635.58 <br />TOTAL TO DATE <br />383,78 <br />514,469.19 <br />50.00 <br />50.00 <br />251,279 01 <br />549,560.87 <br />585,143.77 <br />946,761.47 <br />551,161,63 <br />546,011.38 <br />$10,744.67 <br />50.00 <br />5289,383.78 <br />