Laserfiche WebLink
ITEM <br />NO. <br />ITEM <br />ORIGINALUUNI HAUL <br />DESCRIPTION UNIT QTY. UNIT PRICE <br />nio rc vu <br />OTV. TOTAL PRICE QTY. TOTAL PRICE <br />LS <br />1.00 <br />10 <br />2573.502 <br />SILT FENCE. TYPE MACHINE SLICED <br />LF <br />60.00 <br />62.85 <br />0.00 <br />50.00 <br />20.00 <br />557.00 <br />11 <br />2573.53 <br />INLET PROTECTION (WMCO) <br />EACH <br />1.0D <br />5165.00 <br />0.00 <br />60.00 <br />0,00 <br />50.00 <br />12 <br />2575.604 <br />SEEDING (TYPE 270) <br />SY <br />'475,00 <br />53.61 <br />0.00 <br />60.00 <br />0.00 <br />6000 <br />13 <br />2582.501 <br />PAVEMENT MESSAGE (HANDICAP SYM) - EPDXY <br />EACH <br />2.00 <br />523175 <br />2.00 <br />546350 <br />2,00 <br />5463.50 <br />14 <br />2562.502 <br />4" SOLID WHITE LINE - EPDXY <br />LE <br />720,00 <br />53.09 <br />1308.00 <br />54,041.72 <br />1,308.00 <br />$4,041,72 <br />15 <br />SPEC <br />DENSITY TEST, IN PLACE <br />EACH <br />1.00 <br />582.40 <br />2.00 <br />5164.80 <br />2.00 <br />5164.80 <br />16 <br />SPEC <br />NUCLEAR BITUMINOUS DENSITY <br />EACH <br />6.00 <br />625.75 <br />0.00 <br />60.00 <br />0.00 <br />60.00 <br />17 <br />SPEC <br />EXTRACTION/GRADATION <br />EACH <br />2.00 <br />5123.60 <br />0.00 <br />50,00 <br />0.00 <br />60.00 <br />18 <br />SPEC <br />AIR VOIDS <br />EACH <br />2.00 <br />5123.60 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />5500.00 <br />1.00 <br />6500.00 <br />1.00 <br />550000 <br />SCHEDULE 6.0 • SPOONER PARK • TOTAL 528.322,44 539.067.11 <br />SCHEDUI E 7.0 - PEDESTRIAN CURB RAMPS <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.00 <br />5800.00 <br />0,00 <br />50.00 <br />0.00 <br />50.00 <br />2 <br />2521.501 <br />4" CONCRETE PAVEMENT <br />SY <br />10.00 <br />543.26 <br />000 <br />60.00 <br />0.00 <br />50.00 <br />3 <br />2531.602 <br />PEDESTRIAN CURB RAMP <br />EACH <br />' 1,00 <br />6927.00 <br />0.00 <br />$0.00 <br />0.00 <br />5000 <br />4 <br />2531.602 <br />PEDESTRIAN CURB RAMP (COLORED) <br />EACH <br />5.00 <br />51,339.00 <br />0,00 <br />50.00 <br />000 <br />50.00 <br />5 <br />2531.618 <br />TRUNCATED DOMES <br />59' <br />56,00 <br />537.08 <br />000 <br />60.00 <br />0.00 <br />50.00 <br />SCHEDULE 7.0- PEDESTRIAN CURB RAMPS - TOTAL 50.00 50,00 <br />CHANGE ORDER 1.0 - ROSEWOOD DRIVE CORRECTION <br />1 <br />2021,501 <br />MOBILIZATION <br />LS <br />1.00 <br />51,000.00 <br />1.00 <br />51,000.00 <br />1.00 <br />51600.00 <br />2 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />5Y <br />333.33 <br />$350 <br />437.00 <br />51,529.50 <br />437.00 <br />51,529.50 <br />3 <br />2105.501 <br />COMMON EXCAVATION (P) <br />CY <br />222.22 <br />517.00 <br />147.00 <br />52,499,00 <br />147.00 <br />52,499.00 <br />4 <br />2105,522 <br />SELECT GRANULAR BORROW (CV) <br />CY <br />111.11 <br />517.00 <br />118.00 <br />52,006.00 <br />11800 <br />52,006.00 <br />5 <br />2105604 <br />GEOTEXTILE FABRIC <br />SY <br />318.139 <br />53.00 <br />404.00 <br />51,212.00 <br />404.00 <br />5151200 <br />6 <br />2211.501 <br />AGGREGATE BASE CLASS 5 <br />TON <br />137.78 <br />618.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />7 <br />2350.502 <br />TYPE MV4 WEAR COURSE MIXTURE <br />TON <br />36.67 <br />565.90 <br />0.00 <br />60.00 <br />0.00 <br />50,00 <br />8 <br />2503.602 <br />CONNECT TO EXISTING STORM STRUCTURE <br />EACH <br />2,00 <br />6775.00 <br />1.00 <br />5775.00 <br />1.00 <br />$775.00 <br />2502.541 <br />4" PERF PE PIPE DRAIN IN/SOCK <br />LF <br />289.00 <br />61.50 <br />0,00 <br />50.00 <br />0,00 <br />60,00 <br />9 <br />2563.601 <br />TRAFFIC CONTROL <br />LS <br />1,00 <br />5500.00 <br />1.00 <br />6500.00 <br />1.00 <br />550000 <br />CHANGE ORDER 1.0 'ROSEWOOD DRIVE CORRECTION -TOTAL 59.52150 69.521.50 <br />BID SUMMARY <br />SCHEDULE 1.0- ROSEWOOD DRIVE - TOTAL <br />SCHEDULE 2.0- PARK STREET - TOTAL <br />SCHEDULE 3.0- SPRUCE STREET - TOTAL <br />SCHEDULE 4.0 • SYLVAN STREET - TOTAL <br />SCHEDULE 5.0- FIREHALL PARKING LOT - TOTAL <br />SCHEDULE 6.0- SPOONER PARK - TOTAL <br />SCHEDULE 7.0 - PEDESTRIAN CURB RAMPS -TOTAL <br />CHANGE ORDER 1.0 - ROSEWOOD DRIVE CORRECTION -TOTAL <br />TOTAL BID SUMMARY THIS PERIOD <br />TOTAL BID SUMMARY TO DATE <br />THIS PERIOD <br />526,724.02 <br />51,586,20 <br />$197.70 <br />680.34 <br />50.00 <br />$28,322,44 <br />60.00 <br />59,521.50 <br />666,432.20 <br />TOTAL TO DATE <br />AMOUNT EARNED <br />AMOUNT RETAINED <br />MATERIAL ON SITE <br />MATERIAL DEDUCT. <br />PREVIOUS PAYMENTS <br />AMOUNT DUE <br />TOTAL THIS PERIOD <br />566,432,20 <br />53,321 61 <br />60.00 <br />5500 <br />663,110.59 <br />TOTAL TO DATE <br />5355,815.98 <br />517,790.80 <br />50.00 <br />50.00 <br />6274,914,59 <br />563,110.59 <br />676,284.89 <br />586,729.97 <br />546,95917 <br />551,241.97 <br />546,011.38 <br />538,067.11 <br />50.00 <br />59,521.50 <br />5355,615.98 <br />