ITEM
<br />NO.
<br />ITEM
<br />ORIGINALUUNI HAUL
<br />DESCRIPTION UNIT QTY. UNIT PRICE
<br />nio rc vu
<br />OTV. TOTAL PRICE QTY. TOTAL PRICE
<br />LS
<br />1.00
<br />10
<br />2573.502
<br />SILT FENCE. TYPE MACHINE SLICED
<br />LF
<br />60.00
<br />62.85
<br />0.00
<br />50.00
<br />20.00
<br />557.00
<br />11
<br />2573.53
<br />INLET PROTECTION (WMCO)
<br />EACH
<br />1.0D
<br />5165.00
<br />0.00
<br />60.00
<br />0,00
<br />50.00
<br />12
<br />2575.604
<br />SEEDING (TYPE 270)
<br />SY
<br />'475,00
<br />53.61
<br />0.00
<br />60.00
<br />0.00
<br />6000
<br />13
<br />2582.501
<br />PAVEMENT MESSAGE (HANDICAP SYM) - EPDXY
<br />EACH
<br />2.00
<br />523175
<br />2.00
<br />546350
<br />2,00
<br />5463.50
<br />14
<br />2562.502
<br />4" SOLID WHITE LINE - EPDXY
<br />LE
<br />720,00
<br />53.09
<br />1308.00
<br />54,041.72
<br />1,308.00
<br />$4,041,72
<br />15
<br />SPEC
<br />DENSITY TEST, IN PLACE
<br />EACH
<br />1.00
<br />582.40
<br />2.00
<br />5164.80
<br />2.00
<br />5164.80
<br />16
<br />SPEC
<br />NUCLEAR BITUMINOUS DENSITY
<br />EACH
<br />6.00
<br />625.75
<br />0.00
<br />60.00
<br />0.00
<br />60.00
<br />17
<br />SPEC
<br />EXTRACTION/GRADATION
<br />EACH
<br />2.00
<br />5123.60
<br />0.00
<br />50,00
<br />0.00
<br />60.00
<br />18
<br />SPEC
<br />AIR VOIDS
<br />EACH
<br />2.00
<br />5123.60
<br />0.00
<br />50.00
<br />0.00
<br />50.00
<br />5500.00
<br />1.00
<br />6500.00
<br />1.00
<br />550000
<br />SCHEDULE 6.0 • SPOONER PARK • TOTAL 528.322,44 539.067.11
<br />SCHEDUI E 7.0 - PEDESTRIAN CURB RAMPS
<br />1
<br />2021.501
<br />MOBILIZATION
<br />LS
<br />1.00
<br />5800.00
<br />0,00
<br />50.00
<br />0.00
<br />50.00
<br />2
<br />2521.501
<br />4" CONCRETE PAVEMENT
<br />SY
<br />10.00
<br />543.26
<br />000
<br />60.00
<br />0.00
<br />50.00
<br />3
<br />2531.602
<br />PEDESTRIAN CURB RAMP
<br />EACH
<br />' 1,00
<br />6927.00
<br />0.00
<br />$0.00
<br />0.00
<br />5000
<br />4
<br />2531.602
<br />PEDESTRIAN CURB RAMP (COLORED)
<br />EACH
<br />5.00
<br />51,339.00
<br />0,00
<br />50.00
<br />000
<br />50.00
<br />5
<br />2531.618
<br />TRUNCATED DOMES
<br />59'
<br />56,00
<br />537.08
<br />000
<br />60.00
<br />0.00
<br />50.00
<br />SCHEDULE 7.0- PEDESTRIAN CURB RAMPS - TOTAL 50.00 50,00
<br />CHANGE ORDER 1.0 - ROSEWOOD DRIVE CORRECTION
<br />1
<br />2021,501
<br />MOBILIZATION
<br />LS
<br />1.00
<br />51,000.00
<br />1.00
<br />51,000.00
<br />1.00
<br />51600.00
<br />2
<br />2104.505
<br />REMOVE BITUMINOUS PAVEMENT
<br />5Y
<br />333.33
<br />$350
<br />437.00
<br />51,529.50
<br />437.00
<br />51,529.50
<br />3
<br />2105.501
<br />COMMON EXCAVATION (P)
<br />CY
<br />222.22
<br />517.00
<br />147.00
<br />52,499,00
<br />147.00
<br />52,499.00
<br />4
<br />2105,522
<br />SELECT GRANULAR BORROW (CV)
<br />CY
<br />111.11
<br />517.00
<br />118.00
<br />52,006.00
<br />11800
<br />52,006.00
<br />5
<br />2105604
<br />GEOTEXTILE FABRIC
<br />SY
<br />318.139
<br />53.00
<br />404.00
<br />51,212.00
<br />404.00
<br />5151200
<br />6
<br />2211.501
<br />AGGREGATE BASE CLASS 5
<br />TON
<br />137.78
<br />618.00
<br />0.00
<br />50.00
<br />0.00
<br />50.00
<br />7
<br />2350.502
<br />TYPE MV4 WEAR COURSE MIXTURE
<br />TON
<br />36.67
<br />565.90
<br />0.00
<br />60.00
<br />0.00
<br />50,00
<br />8
<br />2503.602
<br />CONNECT TO EXISTING STORM STRUCTURE
<br />EACH
<br />2,00
<br />6775.00
<br />1.00
<br />5775.00
<br />1.00
<br />$775.00
<br />2502.541
<br />4" PERF PE PIPE DRAIN IN/SOCK
<br />LF
<br />289.00
<br />61.50
<br />0,00
<br />50.00
<br />0,00
<br />60,00
<br />9
<br />2563.601
<br />TRAFFIC CONTROL
<br />LS
<br />1,00
<br />5500.00
<br />1.00
<br />6500.00
<br />1.00
<br />550000
<br />CHANGE ORDER 1.0 'ROSEWOOD DRIVE CORRECTION -TOTAL 59.52150 69.521.50
<br />BID SUMMARY
<br />SCHEDULE 1.0- ROSEWOOD DRIVE - TOTAL
<br />SCHEDULE 2.0- PARK STREET - TOTAL
<br />SCHEDULE 3.0- SPRUCE STREET - TOTAL
<br />SCHEDULE 4.0 • SYLVAN STREET - TOTAL
<br />SCHEDULE 5.0- FIREHALL PARKING LOT - TOTAL
<br />SCHEDULE 6.0- SPOONER PARK - TOTAL
<br />SCHEDULE 7.0 - PEDESTRIAN CURB RAMPS -TOTAL
<br />CHANGE ORDER 1.0 - ROSEWOOD DRIVE CORRECTION -TOTAL
<br />TOTAL BID SUMMARY THIS PERIOD
<br />TOTAL BID SUMMARY TO DATE
<br />THIS PERIOD
<br />526,724.02
<br />51,586,20
<br />$197.70
<br />680.34
<br />50.00
<br />$28,322,44
<br />60.00
<br />59,521.50
<br />666,432.20
<br />TOTAL TO DATE
<br />AMOUNT EARNED
<br />AMOUNT RETAINED
<br />MATERIAL ON SITE
<br />MATERIAL DEDUCT.
<br />PREVIOUS PAYMENTS
<br />AMOUNT DUE
<br />TOTAL THIS PERIOD
<br />566,432,20
<br />53,321 61
<br />60.00
<br />5500
<br />663,110.59
<br />TOTAL TO DATE
<br />5355,815.98
<br />517,790.80
<br />50.00
<br />50.00
<br />6274,914,59
<br />563,110.59
<br />676,284.89
<br />586,729.97
<br />546,95917
<br />551,241.97
<br />546,011.38
<br />538,067.11
<br />50.00
<br />59,521.50
<br />5355,615.98