My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-14-1999 Council Agenda
>
City Council Packets
>
1990-1999
>
1999
>
01-14-1999 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2012 8:22:06 AM
Creation date
8/30/2012 8:13:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Greenbriar Circle /County Road B2 Pipe System Improvements <br />City of Little Canada - 100% responsibility - $30,950 <br />Work Item <br />Unit <br />Est. <br />Quantity <br />Unit <br />Cost <br />Extension <br />Mobilization/Demobilization <br />L S <br />1 <br />500 <br />500 <br />Inlet grate/curb box replacement (Neenah <br />R -3067 w /vane grate) <br />Ea. <br />2 <br />600 <br />1,200 <br />Install 12 -inch Corr. Dual Wall PEP <br />L.F. <br />60 <br />25 <br />1,500 <br />Install 18 -inch Corr. Dual Wall PEP <br />L.F. <br />50 <br />30 <br />1,500 <br />Install 30 -inch Corr. Dual Wall PEP <br />L.F. <br />175 <br />40 <br />7,000 <br />30 -inch CMP FES <br />Ea. <br />1 <br />200 <br />200 <br />48 -inch Catch Basin w/ vane grate <br />L S <br />4 <br />2,500 <br />10,000 <br />Curb restoration <br />L.F. <br />50 <br />10 <br />500 <br />Bituminous Pavement Restoration <br />S.Y. <br />25 <br />180 <br />4,500 <br />Turf Restoration <br />S.Y. <br />350 <br />3 <br />1,050 <br />Overflow swale construction <br />S.Y. <br />300 <br />10 <br />3,000 <br />Total* <br />$30,950 <br />*Engineering & Contingency not included. <br />Page 98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.