Laserfiche WebLink
4. Undergrounding of Cable. Pursuant to the Right -of -Way Ordinance, Grantee must <br />place newly constructed facilities underground in areas of City where all other <br />utility lines are placed underground. Amplifier boxes and pedestal mounted <br />terminal boxes may be placed above ground if existing technology reasonably <br />requires, but shall be of such size and design and shall be so located as not to be <br />unsightly or unsafe, all pursuant to plans submitted with Grantee's permit <br />application(s) and approved by City. <br />5. Erection. Removal and Joint Use of Poles. No poles, conduits, amplifier boxes, <br />pedestal mounted terminal boxes, similar structures, or other wire - holding <br />structures shall be erected or installed by the Grantee without required permit of <br />City. <br />6. Safety Requirements. <br />a. The Grantee shall at all times employ ordinary and reasonable care and <br />shall install and maintain in use nothing less than commonly accepted <br />methods and devices for preventing failures and accidents which are likely <br />to cause damage or injuries. <br />b. The Grantee shall install and maintain its System and other equipment in <br />accordance with City's codes and the requirements of the National Electric <br />Safety Code and all other applicable FCC, state and local regulations, and <br />in such manner that they will not interfere with City communications <br />technology related too health safety and welfare of the residents. <br />c. All System structures, and lines, equipment and connections in, over, under <br />and upon the Rights -of -Way of City, wherever situated or located, shall at <br />all times be kept and maintained in good condition, order, and repair so <br />that the same shall not menace or endanger the life or property of City or <br />any Person. <br />SECTION 4. <br />DESIGN PROVISIONS <br />[INSERT MEDIAONE PROMISES- PER LILLIS AND PETERS] <br />1. System Upgrade: Minimum Channel Capacity. <br />a. Grantee shall develop, construct and operate for the term of this Franchise <br />a System providing 750 MIIZ Mliz capacity and which is fully activated <br />with the capability of delivering to all Subscribers capable of receiving <br />them a minimum of up to 81 video programmed channels. Construction <br />Page 27 <br />