Laserfiche WebLink
constructed which exceeds a density of 35 dwelling units per cable mile or <br />greater for overhead plant and 50 dwelling units per cable mile for <br />underground plant. <br />c. Within ninety (90) days after the commencement of the renewal term of this <br />Franchise, Grantee shall commence application for all necessary permits, <br />licenses, certificates and authorizations which are required in the conduct <br />of its business. Failure to timely commence application for the <br />aforementioned authorizations shall be a violation of this Franchise, <br />d. Within ninety (90) days after commencement of the term of this renewed <br />Franchise, Grantee will commence System design, walkout and all other <br />preliminary construction activities related to upgrade of the System and <br />shall give written notice thereof to City upon commencement of such <br />activities. <br />3. Operation and Maintenance of System. The Grantee shall render effective service, <br />make repairs promptly, and interrupt service only for good cause and for the <br />shortest time possible. Such interruption shall occur during periods of minimum <br />use of the System. <br />4. Technical Standards. The technical standards used in the operation of the System <br />shall comply, at minimum, with the technical standards promulgated by the FCC <br />relating to Cable Systems pursuant to Title 47, Section 76.601 to 76.617, as may <br />be amended or modified from time to time, which regulations are expressly <br />incorporated herein by reference. <br />5. Special Testing <br />a. The City shall have the right to inspect all construction or installation work <br />performed pursuant to the provisions of the Franchise. In addition, the <br />City may require special testing of a location or locations within the System <br />if there is a particular matter of controversy or unresolved complaints <br />regarding such construction or installation work or pertaining to such <br />location(s). Demand for such special tests may be made on the basis of <br />complaints received or other evidence indicating an unresolved controversy <br />or noncompliance. Such tests shall be limited to the particular matter in <br />controversy or unresolved complaints. The City shall endeavor to so <br />arrange its request for such special testing so as to minimize hardship or <br />inconvenience to Grantee or to the Subscribers caused by such testing. <br />c. Before ordering such tests, Grantee shall be afforded thirty (30) days <br />following receipt of written notice to investigate and, if necessary, correct <br />problems or complaints upon which tests were ordered. The City shall <br />meet with Grantee prior to requiring special tests to discuss the need for <br />Page 29 <br />