Laserfiche WebLink
THE <br />N0. <br />SCHEDULE 7.0 - PEDESTRIAN CURB RAMPS <br />MOBILIZATION <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY, UNIT PRICE <br />'1 HIS PERIOD <br />QTY. TOTAL PRICE <br />TOTAL O DATE <br />01Y. TOTAL PRICE <br />0.00 <br />50.00 <br />73.507 <br />SILT FENCE. TYPE MACHINE SLICED . ,. <br />1. <br />60.00 <br />.._...5205 <br />0.00 <br />....... 5000 <br />0.00 <br />5000 <br />11 <br />2573,53 <br />INLET PROTECTION(WIMCO) <br />EACH <br />,100 <br />_.016500 <br />0.00 <br />5000 <br />0.00 <br />50.00 <br />12 <br />2575.604 <br />SEEDING (TYPE 270) _. <br />SY_ <br />4]5,005361 <br />51339.00 <br />0.00 <br />50.00 <br />_ <br />_, <br />5000 <br />13 <br />2582501 <br />_. <br />PAVEMENTMESSAGE(HANDICAPSYMZEPDXY _._ <br />EACH <br />2.00 Y <br />523175 <br />0,00 <br />_._.._� <br />5000 <br />2.00 <br />546350 <br />14 <br />2582502 <br />4 SOLID WHITE LINE • EPDXY .., ,_.,. <br />LF <br />720.00 <br />SCHEDULE 7.0 - PEDESTRIAN CURS RAMPS • TOTAL 50.00 $0.00 <br />0.00 <br />5000 <br />1.30000 <br />54.04112 <br />15 <br />SPEC <br />DENSITY TEST, IN PLACE <br />EACH <br />1,00 <br />082.40 <br />300 <br />5247.20 <br />5.00 <br />8402.00 <br />16 <br />SPEC <br />NUCLEAR BITUMINOUS DENSITY <br />EACH <br />6.00 <br />525.75 <br />0.00 <br />5000 <br />000 <br />00.00 <br />17 <br />SPEC <br />EXTRACTION /GRADATION <br />EACH <br />2.00 <br />512360 <br />0,00 <br />50.00 <br />0.00 <br />5000 <br />18 <br />SPEC <br />AIR VOIDS <br />EACH <br />2.00 <br />512360 <br />0.00 <br />50.00 <br />0.00 <br />5000 <br />CIHANGE ORDER 1.0 - ROSEWOOD DRIVE CORRECTION- TOTAL 55.13280 514.654.30 <br />SCHEDULE 6.0 - SPOONER PARK- TOTAL 5848.82 529.915.93 <br />CHANGE ORDER 1.0 - ROSEWOOD DRIVE CORRECTION <br />SCHEDULE 7.0 - PEDESTRIAN CURB RAMPS <br />MOBILIZATION <br />LS <br />SY <br />1.00 <br />10.00 <br />6800.00 <br />543.26 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />f <br />2021.501 <br />3 <br />2521.501 <br />4" CONCRETE PAVEMENT <br />000 <br />5000 <br />0.00 <br />5000 <br />3 <br />2531 602 <br />PEDESTRIAN CURB RAMP <br />EACH <br />1.00 <br />5927.00 <br />0.00 <br />50.00 <br />50.00 <br />0.00 <br />0.00 <br />50.00 <br />80.00 <br />4 <br />2531.602 <br />PEDESTRIAN CURB RAMP) 0LOREO) <br />EACH <br />SP <br />5,00 <br />56.00 <br />51339.00 <br />0,00 <br />5 <br />2531.618 <br />TRUNCATED DOMES <br />537.08 <br />000 <br />50.00 <br />0.00 <br />50.00 <br />AGGREGATE BASE CLASS 5 <br />TON <br />137.76 <br />518,00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />7 <br />2350.502 <br />SCHEDULE 7.0 - PEDESTRIAN CURS RAMPS • TOTAL 50.00 $0.00 <br />CHANGE ORDER 1.0 - ROSEWOOD DRIVE CORRECTION <br />1 <br />2021.505 <br />MOBILIZATION <br />LS <br />1.0D <br />51.000.00 <br />000 <br />50.00 <br />1,00 <br />51.00000 <br />2 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />333.33 <br />03,50 <br />000 <br />50.00 <br />437.00 <br />51529.50 <br />3 <br />2105.501 <br />COMMON EXCAVATION (5) <br />CY <br />222.22 <br />517.00 <br />73.00 <br />01.24100 <br />5000 <br />220,00 <br />118.00 <br />53,740.00 <br />4 <br />2105.522 <br />105.604 <br />SELECTGRANUTAR BORROW.&) <br />GEOTEXTILE FABRIC <br />CY <br />SY <br />111,11 <br />318.89 <br />.51700 <br />53.00 <br />0.00 <br />0.00 <br />0 <br />50.00 <br />404.00 <br />_S2.006.00 <br />51,212.00 <br />2211.501 <br />AGGREGATE BASE CLASS 5 <br />TON <br />137.76 <br />518,00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />7 <br />2350.502 <br />TYPE MV4 WEAR COURSE MIXTURE <br />TON <br />38,67 <br />56500 <br />52.00 <br />53 426.80 <br />52,00 <br />03.42680 <br />57750 0 <br />8 <br />2503.602 <br />CONNECT TO EXISTING STORM STRUCTURE <br />EACH <br />2,00 <br />577500 <br />0.00 <br />00.00 <br />1,00 <br />2502.541 <br />4" PERF PE PIPE DRAIN IN/SOCK <br />LF <br />289.00 <br />5150 <br />310.00 <br />5465.00 <br />31002 <br />5465,00 <br />9 <br />2563.601 <br />TRAFFIC CONTROL <br />LS <br />1.00 <br />5500.00 <br />0,00 <br />50.00 <br />100 <br />5500.00 <br />CIHANGE ORDER 1.0 - ROSEWOOD DRIVE CORRECTION- TOTAL 55.13280 514.654.30 <br />510 507,191ARY <br />SCHEDULE 1.0 - ROSEWOOD DRIVE • TOTAL <br />SCHEDULE 2.0- PARK STREET • TOTAL <br />SCHEDULE 3.0 • SPRUCE STREET • TOTAL <br />SCHEDULE 4.0- SYLVAN STREET -TOTAL <br />SCHEDULE 5.0 - FIREBALL PARKING LOT- TOTAL <br />SCHEDULE 6.0 - SPOONER PARK - TOTAL <br />SCHEDULE 7.0 - PEDESTRIAN CURB RAMPS • TOTAL <br />CHANGE ORDER 1.0 .ROSEWOOD DRIVE CORRECTION. TOTAL <br />TOTAL 010 SUMMARY THIS PERIOD <br />TOTAL BID SUMMARY TO DATE <br />AMOUNT EARNED <br />AMOUNT RETAINED <br />MATERIAL ON SITE <br />MATERIAL DEDUCT, <br />PREVIOUS PAYMENTS <br />AMOUNT DUE <br />TOTAL THIS PERIOD <br />511,010.00 <br />5550.54 <br />5000 <br />50.00 <br />510,460.26 <br />THIS PFR100 <br />0446.58 <br />52,582.05 <br />5101.93 <br />1599.35 <br />51,103.13 <br />6848.82 <br />50.00 <br />55,132.80 <br />$11,010.80 <br />TOTAL. TO DATE <br />TOTAL TO DATE <br />5366.826.78 <br />518,341.34 <br />50.00 <br />00.00 <br />5338,025.18 <br />500,46026 <br />576,731.47 <br />589,712.02 <br />546,857.24 <br />551,841.32 <br />547,114.51 <br />539.915.93 <br />50.00 <br />514,654,30 <br />5308,826.78 <br />