Laserfiche WebLink
ITEM <br />NO <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />01V. UNIT PRICE <br />THIS PERIO0 <br />PM TOTAL P13106 <br />TOTAL 70 DATE <br />Ott. TOTAL PRICE <br />26J <br />SPEC <br />EXTRACTION /GRADATION <br />EACH <br />2.00 <br />5127.50 <br />0.00 <br />50.00 <br />2.00 <br />5255.00 <br />SPEC <br />AIR VOIDS <br />600FI <br />2,00 <br />6127.501 <br />0.00 <br />50,00 <br />2.00 <br />5255.00 <br />SCHEDULE 4.0 •ONTARIO ROAD • TOTAL 52733.68 543.62802 <br />SCHEDULE 5.0- PAYNE AVENUE <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.00 <br />55900.00 <br />0.00 <br />50.00 <br />1.00 <br />55,900,00 <br />2 <br />2104.505 <br />REMOVE CONCRETE CURB ANO GUTTER <br />LE <br />1700.00 <br />51.53 <br />0.00 <br />50.00 <br />1.297.00 <br />61,984.41 <br />62978,40 <br />51,285.20 <br />$2,560.60 <br />3 <br />.,.4.... <br />5 <br />2104.509 <br />2105.525 <br />2112.501 <br />REMOVE DRAINAGE $ TRUCTURE ,,..., <br />TOPSOIL BORROW <br />SUBGRADE PREPARATION <br />EACH <br />CY <br />STA <br />4.00 <br />65.00 <br />23.00 <br />5744.60 <br />618.36 <br />6112.20 <br />0.00 <br />___.. <br />0.00 <br />60.00 <br />60.00 <br />50.00 <br />4.00 <br />70.00 <br />23.00 <br />6 <br />2123.61 <br />EXPLORATORY 010 "GATE VALVE" <br />EACH <br />3.00 <br />5663.00 <br />0.00 <br />$0.00 <br />27.00 <br />617.901.00 <br />7 <br />2211,501 <br />AGGREGATE BASE CLASS 5. BASE CORRECTION <br />TON <br />440.00 <br />518.36 <br />0.00 <br />60.00 <br />0.00 <br />60.00 <br />_8 <br />2232501 <br />MILL BITUMINOUS PAVEMENT <br />SY <br />9680.00 <br />61.10 <br />0.00 <br />60.00 <br />9,880.00 <br />510 868.00 <br />9 <br />2350.501 <br />TYPE MV4 WEAR COURSE MIXTURE (DRIVEWAY <br />TON <br />TON <br />35.00 <br />1220.00 <br />6125,00 <br />55000 <br />3.00 <br />0.00 <br />5375.00 <br />60.00 <br />34.15 <br />983.90 <br />$4 26675 <br />557,066.20 <br />10 <br />2350.501 <br />TYPE MV4 WEAR COURSE MIXTURE <br />11 <br />2350.501 <br />TYPE LV3 NON WEARING COURSE MIXTURE (SASE) <br />TON <br />LE <br />90000 <br />1.00 <br />$5700 <br />547.94 <br />0.00 <br />0.00 <br />60.00 <br />50.00 <br />792.45 <br />16.00 <br />645.169,65 <br />6767.04 <br />12 <br />2503.541 <br />12" RC PIPE SEWER DES 3006, CLV <br />13 <br />2503.602 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />9.00 <br />535700 <br />0.00 <br />60.00 <br />9.00 <br />53,213.00 <br />14 <br />2504.602 <br />ADJUST VALVE 80X <br />EACH <br />1.00 <br />6300.00 <br />0.00 <br />60.00 <br />4.00 <br />0.00 <br />61,20000 <br />60.00 <br />15 <br />2504.602 <br />6" GATE VALVE <br />EACH <br />1.00 <br />62,621.0 <br />0.00 <br />60.00 <br />16 <br />2504.602 <br />6" GATE VALVE BOLT REPLACEMENT <br />VALVE <br />1.00 <br />6979,20 <br />0.00 <br />60.00 <br />2400 <br />623.500,80 <br />17 <br />2506.502 <br />CONST DRAINAGE STRUCTURE DESIGN SPECIAL 24 "X36" <br />EACH <br />3.00 <br />51,448.40 <br />53.202.80 <br />0.00 <br />0.00 <br />50.00 <br />S0.00 <br />3.00 <br />3.00 <br />54,345.20 <br />$9,608.40 <br />18 <br />2508.502 <br />CONST DRAINAGE STRUCTURE DESIGN SPECIAL 48 "X72" <br />EACH <br />3.00 <br />• <br />2506.522 <br />ADJUST FRAME AND RING CASTING <br />EACH <br />3.00 <br />6385.00 <br />1.00 <br />6385.00 <br />9.00 <br />S3485.00 <br />2506,602 <br />REGROUT MANHOLE RINGS <br />EACH <br />700 <br />565,00 <br />0.00 <br />60.00 <br />0.00 <br />60.00 <br />21 <br />2531501 <br />CONCRETE CURB 8 GUTTER DESIGN SURMOUNTABLE <br />LE <br />1700.00 <br />68.82 <br />0.00 <br />60.00 <br />1 297 00 <br />611.39.54 <br />22 <br />2563601 <br />TRAFFIC CONTROL <br />LS <br />1.00 <br />6892.50 <br />0.00 <br />50.00 <br />1.00 <br />6892.50 <br />23 <br />2573.53 <br />INLET PROTECTION (WIMCO) <br />EACH <br />SY <br />EACH <br />6.00 <br />570.00 <br />5.00 <br />590.00 <br />6122 <br />525.50 <br />0.00 <br />0,00 <br />4.00 <br />50.00 <br />6000 <br />(525.50) <br />12.00 <br />632.00 <br />0.00 <br />0.00 <br />5108000 <br />$771,04 <br />60,00 <br />5000 <br />24 <br />2575,604 <br />SPEC <br />SEEDING (TYPE 270) <br />REPLACE MANHOLE RINGS <br />25 <br />26 <br />SPEC <br />GRADATION TEST. CLASS 5 <br />EACH <br />1.00 <br />376.50 <br />0.00 <br />50.00 <br />27 <br />SPEC <br />PROCTOR TEST CLASS 5 <br />EACH <br />1.00 <br />591.80 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />26 <br />SPEC <br />DENSITY TEST IN PLACE <br />EACH <br />200 <br />525.50 <br />0.00 <br />60.00 <br />0.00 <br />$0.00 <br />29 <br />SPEC <br />SPEC <br />CONCRETE TESTING. CYLINDERS (SET OF 3) <br />NUCLEAR BITUMINOUS DENSITY <br />EACH <br />EACH <br />3,00 <br />6.00 <br />591.80 <br />625.50 <br />0.00 <br />0.00 <br />60,00 <br />50.00 <br />1.00 <br />5,00 <br />601.80 <br />6127.50 <br />30 <br />31 <br />SPEC <br />EXTRACTION(GRADATION <br />EACH <br />2.00 <br />5127.50 <br />0.00 <br />50.00 <br />2.0D <br />525500 <br />32 <br />SPEC <br />AIR VOIDS <br />EACH <br />2.00 <br />5127,50 <br />0.00 <br />$0.00 <br />2.00 <br />625500 <br />SCHEDULE 5.0- PAYNE AVENUE • TOTAL 5734.50 6211,01403 <br />SCHEDULE 6.0- CHANGE ORDER p1 IPARK STREET) <br />MOBILIZATION <br />LS <br />1.00 <br />3000.00 <br />0.00 <br />6000 <br />1.00 <br />140.00 <br />53,000.00 <br />6285.60 <br />1 <br />2021.501 <br />2 <br />2104.501 <br />REMOVE. CONCRETE CURB AND GUTTER <br />LE <br />140.00 <br />62.04 <br />0,00 <br />60,00 <br />3 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />5Y <br />235.00 <br />51.63 <br />0.00 <br />80.00 <br />235.00 <br />5383,05 <br />4 <br />2105.501 <br />COMMON EXCAVATION (P) <br />SELECT GRANULAR BORROW(CV) <br />TOPSOIL BORROW <br />CY <br />CY <br />CY <br />120.00 <br />92.00 <br />30.00 <br />510.20 <br />515.61 <br />613,52 <br />0.00 <br />0.00 <br />8.00 <br />60,00 <br />60.00 <br />6108.16 <br />120.00 <br />75.00 <br />8.00 <br />61.224.00 <br />$1,170.75 <br />6108.16 <br />5 <br />2105.522 <br />6 <br />2105.525 <br />2105.604 <br />GEOTEXTILE FABRIC <br />SY <br />265.00 <br />62,04 <br />0.00 <br />$0.00 <br />247.00 <br />S503.68 <br />2211.501 <br />AGGREGATE BASE CLASS 5 (8"L <br />TYPE LV3 NON WEARING COURSE MIXTURE (BASE) <br />TON <br />TON <br />140,00 <br />35,00 <br />510.00 <br />$125.00 <br />•17.38 <br />9.0D <br />_,8173.60) <br />61 125.00 <br />88.68 <br />35.00 <br />6886.60 <br />$4,37500 <br />L9 <br />2350,502 <br />5 <br />