Laserfiche WebLink
EXHIBIT C <br />Description of World <br />Engineering Walkout <br />Engineering Design <br />Commerce Permitting <br />Fiber Optic Cable and Node Installation <br />Amplifier Replacement <br />Passive Equipment Replacement <br />System Balancing and Proof -of- Performance <br />Activation in Phases; Completion By <br />Page 73 <br />Time Frame <br />0 -6 months <br />2 -8 months <br />Day 75 <br />11 -16 months <br />12 -24 months <br />18 -36 months <br />36 months <br />November 30, 2000 <br />