Laserfiche WebLink
5.1.3 The Specifications are those contained in the Project Manual dated as in Subparagraph <br />5.1.2, and are as follows: <br />(Hither list the Specifications here or refer to an exhibit attached to this Agreement.) <br />Section <br />Title Pages <br />01110 Summary of the Work 2 <br />02300 Earthwork 5 <br />5.1.4 The Drawings are as follows, and are dated <br />different date is shown below: <br />(Either list the Drawings here or refer to an exhibit attached to this Agreement.) <br />Number <br />See Exhibit A <br />Title Pages <br />5.1.5 The Addenda, if any, are as follows: <br />Number <br />Date Pages <br />1 March 12, 1998 3 <br />unless a <br />Portions of Addenda relating to bidding requirements are not part of the Contract Documents <br />unless the bidding requirements are also enumerated in this Article 5. <br />5.1.6 Other documents, if any, forming part of the Contract Documents are as follows: <br />(Lis/ (arn additional documents which are intended to form part of the Contract Documents.) <br />m„uNING: Unlicensed photocopying violates U.S. copyright laws <br />Page 66 <br />:ecution. <br />©1997 AIAOO <br />AIA DOCUMENT A107 -1997 <br />ABBREVIATED OWNER - <br />CONTRACTOR AGREEMENT <br />The American Institute <br />of Architects <br />1735 New York Avenue, N.W. <br />Washington, D.C. 20006-5292 <br />