My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-24-2012 Council Workshop Minutes
>
City Council Meeting Minutes
>
2010-2019
>
2012
>
10-24-2012 Council Workshop Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2012 3:06:14 PM
Creation date
10/31/2012 3:06:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />OCTOBER 24, 2012 <br />get programmed for improvement very soon. Another project on the "To <br />Be Considered" list is the Rice Street sidewalk from US Bank to Hardware <br />Hank. Given the Rice Street Phase II project has been pushed off, the <br />Administrator suggested that the City may want to complete this sidewalk <br />link although there is the chance that it would be ripped up when Rice <br />Street is improved. Another improvement that will be needed soon is <br />Woodlyn Avenue due to the poor condition of that street. <br />The Council discussed the Park Land Acquisition Budget and the potential <br />to use dollars from this fund for park and /or trail improvements. The <br />Administrator reported that the City's policy has been to use these funds <br />for acquisition of land or easements, although the Council can change that <br />policy at any time. The Administrator pointed out that there is little <br />opportunity to bring new dollars into this fund given limited new <br />development. The City also has some easement acquisition needs. <br />The Fire Truck Replacement Budget was reviewed. The City <br />Administrator pointed out that this is a new budget funded through levy <br />dollars for future fire truck replacement. There should be adequate dollars <br />in the budget for the next truck replacement. The truck replacement <br />schedule moving forward will determine how this budget works. The <br />Administrator pointed out that the City has the option of issuing capital <br />notes for purchases of this nature and using the levy to repay the notes if <br />funding is less than needed for scheduled replacements. <br />The Water /Sewer Capital Replacement Budget was reviewed with the <br />Administrator pointing out that it is funded by depreciation. It was noted <br />that this budget will fund the future repainting of the City's water tower. <br />The Public Works Superintendent reported there may be a chance that the <br />water tower will only need an overcoat and will not have to be sand <br />blasted. If that is the case, the savings will be significant. The <br />Superintendent reviewed the expenses associated with bolt replacement on <br />gate valves on Keller Parkway as well as the installation of variable speed <br />drives on the Booster Station pumps. The installation of the variable <br />speed drives will allow the City to maintain more consistent levels in the <br />City's water tower without being impacted by peak rates charged by Xcel <br />Energy. <br />Blesener suggested that in considering the recarpeting of the City Hall, <br />that other building needs be identified and addressed at the same time. <br />The Finance Director noted that there is $5,000 allocated in the Capital <br />Improvement Budget for painting. The Council also discussed and agreed <br />that consideration be given to a redesign of the back wall in the Council <br />Chambers. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.