SUBSTANTIAL COMPLETION 0ATE <br />ORIGINAL: <br />REVISED: <br />PARTIAL PAY ESTIMATE 83 FINAL) <br />FROM: May 12,2012 <br />TO: November 19, 2012 <br />CONTRACTOR; Infrastructure TecmolPoles, Inc. <br />ADDRESS: 21040 COmmelt9 8''(d,, Rogers. MN 55374 <br />OWNER: City of Little Canada <br />PROJECT: Interceptor 1-10420 Joint Repairs <br />AM0UNT OF CONTRACT <br />ORIGINAL: $ 404 ,749.00 <br />WITH ALTERNATES: <br />ITEM <br />NO.'. <br />ITEM DESCRIPTION . <br />UNHT <br />ORI0INAL CONTRACT <br />qT'.` UNfT PRICE <br />q1Y. TOTAL PRICE <br />;TOTAL TO DATE <br />0TY. 'TOTAL'PRICE <br />SCHEDULE 1.0 - INTERCEPTOR 1•LC -020 <br />1 <br />2021.501 <br />MOBILIZATION / SETUP <br />LS <br />1,00 <br />5000.00 <br />0.00 <br />00,00 <br />10D <br />55,000.00 <br />55,400.00 <br />2 <br />2503601 <br />PRECLEAN 18' LINE <br />PER REACH <br />3.00 <br />1800 .00 <br />0.00 <br />50.00 <br />3,00 <br />3 <br />2503.601 <br />PRECLEAN 21" LINE <br />PER REACH <br />800 <br />135000 <br />000 <br />50.00 <br />800 <br />510,80000 <br />4 <br />2503.501 <br />PRECLEAN 48' LINE <br />PER REACH <br />8.00 <br />7000.00 <br />0.00 <br />5000 <br />8.00 <br />562,400.00 <br />5 <br />2503.601 <br />POST CLEAN B TELEVISE 15' 8 18' LINE <br />PER REACH <br />14.00 <br />704.OD <br />3,00 <br />12.00 <br />52,382.00 <br />99,52800 <br />14.00 <br />12.00 <br />511.116.00 <br />59,526,00 <br />0 <br />2503.601 <br />POST CLEAN 5 TELEVISE 21 " LINE <br />PER REACH <br />12.00 <br />794,00 <br />7 <br />2503601 <br />POST CLEAN B TELEVISE 48' LINE <br />PER REACH <br />8.00 <br />794,00 <br />800 <br />56,352.00 <br />8.00 <br />56,352,00 <br />8 <br />2503.603 <br />18' PIPE JOINT TESTING <br />PER JOINT <br />4.00 <br />1080.00 <br />0.00 <br />50,00 <br />1.00 <br />11.080.00 <br />9 <br />2503.603 <br />31' PIPE JOINT TESTING <br />PERJOINT <br />17.00 <br />1144,00 <br />0.00 <br />50,00 <br />0.00 <br />10.00 <br />10 <br />2503,003 <br />48' PIPE JOINT TESTING <br />PER JOINT <br />30.00 <br />400.00 <br />0,00 <br />50.00 <br />0.00 <br />50,00 <br />11 <br />2503.603 <br />18' PIPE JOINTS GROUTING <br />PER JOINT <br />4,0D <br />1700 <br />30,00 <br />7.00 <br />70.00 <br />1,265.00 <br />132900 <br />1,569.00 <br />831.00 <br />800.00 <br />0.00 <br />1.00 <br />000 <br />0.00 <br />0,00 <br />6000 <br />51,32000 <br />00.00 <br />50.00 <br />50.00 <br />4.00 <br />19,00 <br />32,00 <br />7.00 <br />62.00 <br />55,06000 <br />525,251.00 <br />550 205.00 <br />55,817 00 <br />349800.00 <br />12 <br />2503.603 <br />21' PIPE JOINTS GROUTING <br />48' PIPE JOINTS GROUTING <br />PER JOINT <br />PER JOINT <br />EACH <br />PER JOINT <br />13 <br />2503803 <br />14 <br />2502603 <br />LIFTING HOLE GROUTING (48' PIPE) <br />15 <br />2503,603 <br />MANHOLE GROUTING (Joints B Pipo Connections) <br />18 <br />2506,521 <br />REPLACE MANHOLE COVER <br />EACH <br />300 <br />300.00 <br />0.00 <br />50,00 <br />100 <br />0900.00 <br />17 <br />2506.522 <br />ADJUST FRAME RING ANO CASTING <br />EACH <br />9.00 <br />192500 <br />0.00 <br />50.00 <br />11.00 <br />521,17500 <br />10 <br />2508602 <br />RAISE SANITARY MANHOLE (BARREL SECTION) <br />FT <br />1.00 <br />3,584.00 <br />000 <br />$0.00 <br />0.00 <br />5000 <br />19 <br />SPEC <br />PROTUDINO TAP REMOVAL <br />EACH <br />LS <br />2.00 <br />1.00 <br />1,500.00 <br />5600.00 <br />1.00 <br />0.00 <br />51,500,00 <br />6000 <br />1.00 <br />1.00 <br />51,500,00 <br />55,800.00 <br />20 <br />SPEC <br />SPOT REPAIR (CIPP) <br />21 <br />SPEC <br />BYPASS PUMPING <br />L5 <br />1.00 <br />500000 <br />0.00 <br />50.00 <br />1.00 <br />56,000.00 <br />SCHEDULE 1.0' INTERCEPTOR I- I,Od20 -TOTAL $21,091.00 5201,987.00 <br />ALTERNATE 1.0- ADDITIONAL SERVICE WORK <br />1 <br />2501501 <br />CLEAN B GROUT SANITARY SERVICE (18' MAINLINE) <br />EACH <br />3.00 <br />4,120.00 <br />4,120,00 <br />5004.00 <br />0.00 <br />0.00 <br />0.00 <br />5000 <br />5000 <br />50.00 <br />5.00 <br />5.00 <br />7.00 <br />820 600.00 <br />520,6000D <br />535 028,00 <br />2 <br />2503.601 <br />CLEAN 8 GROUT SANITARY SERVICE (21" MAINLINE) <br />EACH <br />7,00 <br />5 <br />2503.601 <br />CLEAN B GROUT SANITARY SERVICE (48' MAINLINE) <br />EACH <br />9.00 <br />ALTERNATE 1.0 -ADDITIONAL SERVICE WORK - TOTAL 80,00 570,220.00 <br />AIDSUMMARY <br />SCHEDULE 1,0 - INTERCEPTOR 1.10-420- TOTAL <br />ALTERNATE 1.0 . ADDITIONAL SERVICE WORK • TOTAL <br />TOTAL BID SUMMARY THIS PERI00 <br />TOTAL BID SUMMARY TO DATE <br />THI^ PERK* <br />521,091,00 <br />50.00 <br />$31,001.00 <br />I.QTAL T�0AE <br />5281.887,00 <br />570,228.00 <br />5368,216,00 <br />AMOUNT EARNED <br />AMOUNT RETAINED <br />MATERIAL ON SITE <br />irdA <br />MATERIAL DEDUCT. <br />PREVIOUS PAYMENTS <br />AMOUNT DUE <br />IOTALTNI6 P20000 <br />521.091.00 <br />::'TOTAL TO PATE <br />0,215.00 <br />50.00 <br />516 85910 <br />50.00 J r <br />50.00 <br />50.00 <br />5320,287.80 <br />..... ... .... <br />37,947.20 <br />2 <br />