Laserfiche WebLink
in the 6_'i <br />49) from 2 to Coon <br />resurfaced with a 8 -1/2 inch <br />at the expense of 10 n1)01 in the summer €at' 2011 <br />Ramsey Couaaiv to delay the proposed roadway reconstruction la <br />seied tlect for the construction season of 2014 on this segment of Rice Street. <br />.a3 €aeanaodate the increased traffic voiu nes that will utilize Rice Street as <br />an alternate t cute dud' truetion project during in 2013 <br />three 2. 15 eons <br />deteriorated pavement conditions. <br />.) The eTi ev County <br />alternate City' and C <br />FVinPASS eonstructiona. 1Beterh r ; +teon of the pavement condition caused by <br />ent degradation on <br />riiaai; atuhfie will utilize du <br />increased traffic diverted hv the <br />determined the Racal ay= <br />rnana emenat ,)r( $ <br />deterioration caused by <br />and changed <br />\'ht aas.s project to the local systenna Nail€ be <br />'.eordanee with their pavement <br />e. <br />Memorandum of Understand <br />system will be. negotiated irx <br />The 12it;' /r1uD0'l sviLi requi'r <br />routes to n <br />afte v�oln nee aatet paaavaenaent d <br />segments sharp he part of the <br />e deterer.ruaed dete'aon`attfka8 <br />O t0) <br />one tale local. <br />chaa <br />reduee delays <br />'ee, 1n@ilin <br />a1P <br />vinDE.it's exp. <br />eh hdtula <br />tic modeling aaaatl project <br />The City <br />t;; /p hasi <br />0 Ira <br />project to afto a odeii €a aced rn;jeet tape .g/1 anad at as � he nneecssaa,y- <br />for :NIan0'l' to ono. Vic. ei:e Ipn•<a e.et or Bvrojece ph as to address the concerns <br />County. nE,anaiy�.'Ehe 'itw- e 111 he e <br />