<br />March 7, 1997
<br />City of Little Canada
<br />515 Little Canada Road
<br />Little Canada, MN 55117
<br />Re:
<br />N0.474 P002
<br />Bonethoo, Rosene, Andeelik and Aaunates. Inc. re an Alfamatfve Action/Equal Opportunity Employer
<br />PrincipaLsOtte G. Bonestroo, Y.E. • Josepn C. AndCrllk, P.E. • Marvin L. Sorvale, P.E •
<br />Richard E. Turner, RE, . Glenn R. Cook, P.E. • Thomas E. Noyes, P.E. • Robert G. Schunitht, RE.
<br />Jerry A. Bourdon. P.E. • Robert W Rosene, PE, and Susan M Eberlm. CPA., $¢nlor Consultants
<br />Associate Principals. Howard A. Sanford, P.E. • Keith A Gordon, P.E. • Robert R, Pfenertc. RE. •
<br />Richard W Rosser, RE. • David O. Leskota, P.E. • Robert C. Rusaek, MA. • Mark A. Manton, RE. •
<br />Michael T Rat/Mann. P.E.. Ted K.Fleld, RE
<br />Offices: St. Paul and Rochester. MN • Mequon, WI
<br />Arcade Street
<br />Utility & Street Improvement Project
<br />BRA Pile No. 37231
<br />Honorable Mayor & City Council Members:
<br />Bids were opened for the project stated above on Tuesday, March 4, 1997, Transmitted under separate
<br />cover are ten (10) copies of the bid tabulation for your information and file.
<br />The following summarizes the results of the low five of seven bids received as compared with esdmated
<br />results.
<br />Contractor
<br />Low Ryan Contracting
<br />#2 Ashbach Construction Co.
<br />Feasibility Study Estimate
<br />#3 RM. Prattalone Excavating
<br />Average Bud
<br />Engineer's Estimate
<br />#4 Bonine Excavating, Inc,
<br />#5 Ann Construction Co.
<br />#6 Valley Paving, Inc.
<br />#7 C.S. McCrossan Const, Inc.
<br />Base EU
<br />$ 884,219.20
<br />$ 960,214.85
<br />$ 934000.00
<br />$ 971,999.32
<br />$ 972,134.95
<br />$ 975,000.00
<br />$1,007,163.10
<br />$1,037,078.30
<br />$1,054,424.31
<br />$1,151,685.84
<br />The low bidder on the project was Ryan Contracting, Inc. with a Base Bid of $884,219.20. Ramsey
<br />Washington Metro Watershed District will pay for approximately $120,000 of the contraction costs. The
<br />District has approved an expenditure of up to $240,000 for project costs related to the Ditch 7A
<br />improvements,
<br />The bid also included five alternates. The low bidder presented these deducts as follows:
<br />Alternate No. 1 — Replace concrete pipe with plastic pipe
<br />Alternate No. 2 — Replace sod with seed (hydroseed)
<br />Aitcrnatc, Nu. 3 — lusulate Instead of replacing water main
<br />Alternate No. 4 — Replace quarry with recycled aggregate base
<br />Alternate No. 5 — Seed without mulch in lieu of sod
<br />($20,305.00)
<br />($20,242,50)
<br />($35,322.50)
<br />($ 8,080.00)
<br />($21,330.00)
<br />These bids have been reviewed and found to be in order. We are familiar with Ryan Contracting and
<br />consider them to be reputable and fully capable of performing quality work in an expedient manner. We
<br />therefore recommend that the project be awarded to Ryan Contracting, Inc. for the Base Bid amount of
<br />$884,219,20, In addition, we recommend that Alternate Bid No, 4 be accepted, and that Alternate Bid No.
<br />2335 West Highway 36 • St. Pant, MN 55113 -3898 * 612 - 636 -4600