03/07/97 13:10 <br />BONESTROO ASSOC 3 484 4538 <br />Bonestroo <br />d Rosene <br />inAnderiik & <br />Associates <br />Engineers & Architects <br />March 7, 1997 <br />City of Little Canada <br />515 Little Canada Road <br />Little Canada, MN 55117 <br />Re: <br />N0.474 P002 <br />Bonethoo, Rosene, Andeelik and Aaunates. Inc. re an Alfamatfve Action/Equal Opportunity Employer <br />PrincipaLsOtte G. Bonestroo, Y.E. • Josepn C. AndCrllk, P.E. • Marvin L. Sorvale, P.E • <br />Richard E. Turner, RE, . Glenn R. Cook, P.E. • Thomas E. Noyes, P.E. • Robert G. Schunitht, RE. <br />Jerry A. Bourdon. P.E. • Robert W Rosene, PE, and Susan M Eberlm. CPA., $¢nlor Consultants <br />Associate Principals. Howard A. Sanford, P.E. • Keith A Gordon, P.E. • Robert R, Pfenertc. RE. • <br />Richard W Rosser, RE. • David O. Leskota, P.E. • Robert C. Rusaek, MA. • Mark A. Manton, RE. • <br />Michael T Rat/Mann. P.E.. Ted K.Fleld, RE <br />Offices: St. Paul and Rochester. MN • Mequon, WI <br />Arcade Street <br />Utility & Street Improvement Project <br />BRA Pile No. 37231 <br />Honorable Mayor & City Council Members: <br />Bids were opened for the project stated above on Tuesday, March 4, 1997, Transmitted under separate <br />cover are ten (10) copies of the bid tabulation for your information and file. <br />The following summarizes the results of the low five of seven bids received as compared with esdmated <br />results. <br />Contractor <br />Low Ryan Contracting <br />#2 Ashbach Construction Co. <br />Feasibility Study Estimate <br />#3 RM. Prattalone Excavating <br />Average Bud <br />Engineer's Estimate <br />#4 Bonine Excavating, Inc, <br />#5 Ann Construction Co. <br />#6 Valley Paving, Inc. <br />#7 C.S. McCrossan Const, Inc. <br />Base EU <br />$ 884,219.20 <br />$ 960,214.85 <br />$ 934000.00 <br />$ 971,999.32 <br />$ 972,134.95 <br />$ 975,000.00 <br />$1,007,163.10 <br />$1,037,078.30 <br />$1,054,424.31 <br />$1,151,685.84 <br />The low bidder on the project was Ryan Contracting, Inc. with a Base Bid of $884,219.20. Ramsey <br />Washington Metro Watershed District will pay for approximately $120,000 of the contraction costs. The <br />District has approved an expenditure of up to $240,000 for project costs related to the Ditch 7A <br />improvements, <br />The bid also included five alternates. The low bidder presented these deducts as follows: <br />Alternate No. 1 — Replace concrete pipe with plastic pipe <br />Alternate No. 2 — Replace sod with seed (hydroseed) <br />Aitcrnatc, Nu. 3 — lusulate Instead of replacing water main <br />Alternate No. 4 — Replace quarry with recycled aggregate base <br />Alternate No. 5 — Seed without mulch in lieu of sod <br />($20,305.00) <br />($20,242,50) <br />($35,322.50) <br />($ 8,080.00) <br />($21,330.00) <br />These bids have been reviewed and found to be in order. We are familiar with Ryan Contracting and <br />consider them to be reputable and fully capable of performing quality work in an expedient manner. We <br />therefore recommend that the project be awarded to Ryan Contracting, Inc. for the Base Bid amount of <br />$884,219,20, In addition, we recommend that Alternate Bid No, 4 be accepted, and that Alternate Bid No. <br />2335 West Highway 36 • St. Pant, MN 55113 -3898 * 612 - 636 -4600 <br />Page 32 <br />