Laserfiche WebLink
Mr. Steve Grittman <br />8/26/96 <br />Again, the first option is the most preferred. in. :order to achieve the space <br />required for the two (2) proposed new sexvtce.bays <br />The new building expansion consists o£ erecting a :Structure to match Me <br />existing building. Construction of wood posts set in- Concrete post footings ro <br />below frost depth, wood cross purlins, pre - engineered wood roof trusses, with <br />prefmished metal siding and roofing for exterior finishes..- . Roof and wall <br />insulation would meet all code requirements. The front of existing building <br />would also receive new metal wall panels and trim .in_`order. to maintain a <br />consistent color and appearance. In addition, the existing facility would <br />undergo minor interior renovations including office area expansion and toilet <br />room alterations. (See attached copy of preliminary floor plan.) <br />All mechanical and electrical construction work would be contracted as a <br />"design build" service and work completed by a Certified Master Electricians <br />and Plumbers as required and the building structure addition will be certified <br />by a Structural Engineer registered in the State of Minnesota and plans <br />submitted accordingly. <br />In order to proceed with further building plans and construction contracts, <br />Selland Auto respectfully asks for a "variance" to encroach upon property line <br />setbacks, and would like to have this matter formally presented to City Council <br />for final decisions /approval. <br />If you have any further technical questions please contact myself at any time. <br />Sincerely, <br />Steven A. Trudeau <br />Project Manager <br />SAT /sb <br />Attachments <br />Page 74 <br />KRAUSANDERSON CONSTRUCTION COMPANY <br />CONTRACTORS '. CONSTRUCTION \ ANACERS <br />