My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-13-1997 Council Agenda
>
City Council Packets
>
1990-1999
>
1997
>
08-13-1997 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2013 9:20:55 AM
Creation date
3/11/2013 9:19:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subd. 5. Use of Permit Fees. All Obstruction and Excavation Permit Fees shall be used <br />solely for City management, construction, maintenance and Restoration costs of the Right -of- <br />Way. <br />Sec. 1.13. Right -of -Way Restoration. <br />Subd. 1. The work to be done under the Permit, and the Restoration of the Right -of -Way as <br />required herein, must be completed within the dates specified in the Permit, increased by as <br />many days as work could not be done because of circumstances constituting force majeure or <br />when work was prohibited as unseasonal or unreasonable under Section 1.16, Subd. 2 all in the <br />sole determination of the City. In addition to repairing its own work, the Permittee must restore <br />the general area of the work, and the surrounding areas, including the paving and its foundations, <br />to the same condition that existed before the commencement of the work and must inspect the <br />area of the work and use reasonable care to maintain the same condition for thirty -six (36) <br />months thereafter. <br />Subd. 2. In its application for an Excavation Permit, the Permittee may choose to have the <br />City restore the Right-of-Way. In any event, the City may determine to perform the Right -of- <br />Way Restoration and shall require the Permittee to pay a Restoration Fee to provide for <br />reimbursement of all costs associated with such Restoration. In the event Permittee elects not to <br />perform Restoration, City may, in lieu of performing the Restoration itself, impose a fee to fully <br />compensate for the resultant Degradation as well as for any and all additional City Costs <br />associated therewith. Such fee for Degradation shall compensate the City for costs associated <br />with a decrease in the useful life of the Right -of -Way caused by Excavation and shall include a <br />Restoration Fee component. Payment of such fee does not relieve a Permittee from any <br />Restoration obligation. <br />(a) City Restoration. If the City restores the Right -of -Way, the Permittee shall pay the <br />costs thereof within thirty (30) days of billing. If, during the thirty-six (36) months following <br />such Restoration, the Right -of -Way settles due to Permittee's Excavation or Restoration. the <br />Permittee shall pay to the City, within thirty (30) days of billing, the cost of repairing said Right - <br />of -Way. <br />(b) Permittee Restoration. If the Permittee chooses at the time of application for an <br />Excavation Permit to restore the Right -of -Way itself, such Permittee shall post an additional <br />Performance and Restoration Bond in an amount determined by the City to be sufficient to cover <br />the cost of restoring the Right -of -Way to its pre - Excavation condition. If, thirty -six (36) months <br />after completion of the Restoration of the Right -of -Way, the City determines that the Right -of- <br />Way has been properly restored, the surety on the Performance and Restoration Bond posted <br />pursuant to this Subd. 2(b) shall be released. <br />Subd. 3. The Permittee shall perform the work according to the standards and with the <br />materials specified by the City. The City shall have the authority to prescribe the manner and <br />Page 112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.