My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-13-1997 Council Agenda
>
City Council Packets
>
1990-1999
>
1997
>
08-13-1997 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2013 9:20:55 AM
Creation date
3/11/2013 9:19:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
further acknowledges that installation of the improvements is a priority <br />and that construction of the model units will be secondary to the <br />construction of said improvements. No other building permits shall be <br />issued until installation of sanitary sewer, storm sewer, water main, curb <br />and gutter, and the first lift of bituminous surface, and approval of same <br />by City. <br />15. Additional Requirements. <br />a. The Developer shall comply with the Little Canada <br />landscaping ordinance. <br />b. Through this Development Agreement, Developer acknowledges <br />responsibility for performance pursuant to the Agreements between <br />Owner /Applicant and City of Little Canada as to Costs, dated March 31, 1997 <br />and April 29, 1997 executed by Frank M. Frattalone, attached and <br />incorporated herein as Exhibits "B" and "C" respectively. All monies <br />deposited pursuant to Exhibits "B" and "C" shall be applied to the deposit <br />requirement under Paragraph #11 above. <br />c. The placement of durable iron monuments for marking of <br />platted lots, blocks and boundaries must be set within one year of the <br />recording of a plat or parcel. All plat monuments originally set which are <br />removed or disturbed during development shall be replaced after the <br />completion of construction activities or no later than November 1, 1998. <br />All cost incurred with regard to monument placement, verification and <br />replacement shall be borne by the Developer. <br />d. Entrance signage for the development shall be in accordance <br />with City ordinance requirements. Verification of same shall be made by <br />the City's Planner. <br />e. Street signage shall be installed in association with the <br />development in the manner as prescribed by the City's Public Works <br />Director. <br />Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.