Laserfiche WebLink
08/27/97 12:19 (7_11 :03 NO:613 <br />too <br />Rosene <br />Project Narne <br />Centerville Road Water Main Improvements <br />f Isferillociateric6 <br />¢glmaniuemwr <br />act No. <br />File No. 37234 <br />Bid Opening <br />11:00!A.M., C.D.S.T., Monday, August 25, 1997 <br />Owner Little Canada, MN <br />1 hereby certify that this] is an exact <br />reproduepgn of bids received <br />Paul C. IIluer, P.E. Registration Na. 22785 <br />No. Item <br />Unit <br />Qty <br />BID TABULATION <br />Tabulation of Three Low Bids of Three Received <br />Bid No. l <br />I41L Frattalone <br />Excavating <br />Bid No. 3 Bid No. 3 <br />Penn Contracting, Ro-So Contracting, <br />Iat Inc. <br />Unit <br />Price Total <br />Colt <br />Price Total <br />Unit <br />Price Total <br />1 Traffic cannel 14 1 <br />2 Mobilization LS 1 <br />3 Clear & cob LS 1 <br />4 Connect to existing 8• DIP BA <br />5 16'x8' wet tap including 8' gamvahw EA <br />6 Remove bituminous surface SY 25 <br />7 Clara S aggregate base • 12" TN 20 <br />8 Type 31 bituminous base • 3" TN 5 <br />9 Type 41 binucinona wear - 1.112" TN 2.5 <br />10 Saw out bituminous surface 12 40 <br />11 8" DIP, Class 53, 7.5' minimum raver LP 975 <br />12 6" DIP. Class 53,7,5minimumcover LP 8 <br />13 6 " gate valve EA 1 <br />14 Imtdl S" valve hydrant EA 1 <br />15 Ductile iron fittings La 1.500 <br />16 1' corporation stop HA 7 <br />17 I' curb atop and box EA 7 <br />18 1" Type It capper pipe • subsurface boring; LP 450 <br />19 Improved pipe foundation LP 300 <br />20 Mechanical bench compaction 1P 1.433 <br />21 lelaviae nnttary sewer 124 1,900 <br />Teal Base Bid <br />37234,bt <br />2264.61 3,264.67 <br />6,300.00 6,300.00 <br />3,000.00 3,000.00 <br />1,200.00 1400.00 <br />2.000.00 2,000.00 <br />10.00 250.00 <br />20.00 400.00 <br />100.00 500.00 <br />100.04 250.00 <br />2,00 80.00 <br />25,00 24,375.00 <br />19.00 15200 <br />595.00 595.00 <br />1,300.00 1,300.00 <br />0.80 1,20000 <br />28200 1;97400 <br />325.00 2275.00 <br />9.60 4,320.00 <br />0,30 150.00 <br />0.01 1433 <br />0.20 800.00 <br />$54,400.00 <br />Page 12 <br />2,300.00 2500.00 <br />1,000,00 1,000.00 <br />1400.00 1,500.00 <br />2,500,00 2400,00 <br />2,800.00 2,800,00 <br />4.00 100.00 <br />25.00 500.00 <br />100.00 500.00 <br />110.00 275.0D <br />5.00 200.00 <br />40.00 39,000.00 <br />42.00 336.00 <br />600.00 600.00 <br />2,400.00 2,400.00 <br />1.00 1,500.00 <br />113.00 805.00 <br />180.00 1,260.00 <br />23,00 11,250.00 <br />5.00 1,500.00 <br />1.00 1,433.00 <br />1.00 1,000.00 <br />$72,959.90 <br />500,00 100.00 <br />7,500.00 7,500.00 <br />500.00 500.00 <br />1,000.00 1.000.00 <br />5.000.00 5,000.00 <br />5.00 125.00 <br />25.00 500.00 <br />200.00 1,000.00 <br />200.00 500.00 <br />5.00 200.00 <br />35.00 34,125.00 <br />20.00 160.00 <br />500.00 500.00 <br />1,500.00 1,500.00 <br />0.10 150,00 <br />1,000.00 7,000.00 <br />1,000.00 7,000.00 <br />15.00 6,750.00 <br />0.10 30.00 <br />0.01 1433 <br />0.50 500.00 <br />$74,554.33 <br />