My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-26-1997 Council Agenda
>
City Council Packets
>
1990-1999
>
1997
>
11-26-1997 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2014 3:08:43 PM
Creation date
3/11/2013 1:52:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Hanson <br />November 20, 1997 <br />Page Two <br />rely on the work done for the original construction of the City <br />Hall Building and save this Expense.) Surveys, existing Design <br />Concept /Development Drawings and copies of Drawings as prepared for <br />the original Construction. <br />I understand that it shall be a requirement that Construction <br />Documents be Complete and ready to solicit Bids by the end of <br />February, 1998, and that the Building's Dedication is planned for <br />early October, 1998 which will require Completion of Construction <br />by early to mid September, 1998. I agree to devote the time necessary <br />to complete each Phase of our Work in a timely manner to meet this <br />Schedule. I, as well as the Consultants I shall engage, agree to <br />remain responsibly involved thru the completion of this Project and <br />to attend necessary meetings to help insure the successful completion <br />of this Project. Meetings shall include but, not be limited to, <br />working with Yourself, City Staff, Commissions /Committees of the City <br />and the Historical Society and including assistance with fundraising <br />activities. <br />I propose that Compensation for the above Architectural Services be <br />based upon the Fixed Fee of $13,800.00. Compensation shall be due and <br />payable monthly based upon the percentage of completion of our Phases <br />of the Work. <br />In the event that substantial changes to the Drawings or Scope of <br />the Work should be requested by the City or it's Agents after a <br />Phase has been completed and accepted, or Architectural Services <br />that we mutually agree to be Additional Architectural Services are <br />required, additional Compensation shall be based upon the Hourly <br />Rate of $60.00 per hour, or upon a previously agreed upon Lump -Sum <br />amount. <br />In addition to the foregoing Compensation, all expenditures made in <br />the interest of the Project will be reimbursable at my cost. These <br />items will include but, not be limited to the following: reproduction <br />of Drawings and Construction Documents, photo coping and /or photo- <br />graphic reproduction. <br />All additional services and /or significant direct expense items <br />shall be authorized by yourself prior to commencement of the Work <br />or incurrance of the expense. <br />As a footnote to this Proposal, I would like to express my interest <br />in working with the City of Little Canada to provide the Services <br />of Construction Management for the actual Construction of this <br />Project. I have been both directly and indirectly involved in other <br />projects completed in this manner and I believe that the City could <br />realize cost savings by acting as it's own Generla Contractor and <br />hiring Construction Management. I would be most happy to discuss <br />this possibility in detail if the City has equal interest. <br />Page 150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.