Laserfiche WebLink
Memorandum <br />To: <br />From: <br />Date: <br />Subject: <br />Joel Hanson <br />Paul Finsness <br />October 8, 1996 <br />Summary of Tentative Changes #1 - 10 <br />Old Fire Station Renovation Project <br />Tentative Change <br />#1 - Deteriorated Brick Replacement: <br />#2 - Light Fixtures @ Rooms 001, 002, and 100: <br />#3 - Anchor Bolts @ Masonry Parapets: <br />#4 - Electric Baseboard @ Room 012: <br />#5 - Painting Walls @ Rooms 100, 101, and 111: <br />#6 - Wall and Roof Repairs: <br />a. 6" masonry course, etc. $386.00 <br />b. 2" x 10" roof joists, etc. $2,450.00 <br />c. 8" concrete block infill $412.50 <br />- Ceramic Tile Flooring @ Room 007: <br />#8 - Miscellaneous Omissions: <br />a. Deletion wall demolition ($345.00) <br />b. Deletion conc slab closure ($200.00) <br />c. Revised vent/riser route ($175.00) <br />#9 - Relocate and replace gas valve @ Room 011: <br />#10 - Miscellaneous Items: <br />a. Flooring @ door 004 $25.30 <br />b. Rain leader elbow $118.80 <br />TOTAL $5,196.80 <br />PFA <br />PAUL FINSNESS <br />ARCHITECTS <br />Contractor's Estimated Cost <br />$1,480.00 [1] <br />$355.00 [2] <br />$106.70 [3, 11] <br />$345.00 [4] <br />$240.00 [5] <br />$2,836.00 [6, 11] <br />Not Accepted <br />$305.00 [7] <br />($720.00) [8] <br />Status <br />Accepted <br />Accepted <br />Recmnd Approval <br />Accepted <br />Accepted <br />Recmnd Approval <br />Accepted <br />Recmnd Approval <br />$105.00 [9,11] Recmnd Approval <br />$144.10 [10, 11] Recmnd Approval <br />[1] Removal and replacement of deteriorated brick at the north and west wall areas designated for <br />masonry restoration. <br />[21 Reinstallation of existing ceiling mounted fluorescent light fixture removed to accommodate the <br />construction of room 012. Installation of a ceiling mounted fluorescent strip light in room 002. <br />Installation of a recessed fluorescent downlight fixture type "C" in room 100. <br />[31 Installation of Yz" x 12" steel anchor bolts at concrete filled cores in new masonry parapets. <br />[41 Installation of a 2' -0" section of electric baseboard at the north wall of room 012. <br />[5] Painting existing walls and ceiling of room 111; existing wall above the wood wainscot at room 101 to <br />the south corner; and the existing walls and ceiling of stairs in room 100. <br />[6] Wall and roof repairs: <br />a. Demolition of existing wood board at exterior wall face; removal of roof joist ends; installation of <br />masonry course. <br />b. Demolition of existing ceiling; removal of concrete fill; installation of wood blocking, wood joists, <br />and gypsum board ceiling. <br />c. Demolition of existing south stucco panel; installation of 8" concrete block infill. <br />Removal of existing flooring and installation of 1" x 1" unglazed ceramic tile flooring in room 007. <br />Miscellaneous credits: <br />a. Deletion of demolition of existing east wall at stair 100. <br />b. Deletion of concrete slab closure at room 009. <br />c. Revised waste and vent route for sink in room 009. <br />Gas valve relocated and replaced to accommodate room 011 partition. <br />Miscellaneous items: <br />a. Removal of floor tile; floor leveling; installation of vinyl floor tile at door opening 004. <br />b. Installation of elbow in rain leader from hose tower roof to avoid glass block openings. <br />Work completed. <br />[7] <br />[81 <br />File 73/1 Larpenteur Avenue East Saint Paul, AA 55117.2528 <br />Page 112 <br />Voice /Fax 6/2 771 -7183 <br />