My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-1996 Council Agenda
>
City Council Packets
>
1990-1999
>
1996
>
09-25-1996 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2013 1:59:25 PM
Creation date
3/18/2013 1:54:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sanitary sewer main extension, any necessary approvals from Metropolitan <br />Council- Wastewater Services Division for connections to sanitary sewer <br />lines, any permit required from the Ramsey- Washington Watershed District <br />for grading and storm water discharge, and any permits or approvals <br />necessary to comply with wetland regulations. The Developer shall <br />reimburse the City for any costs or expenses incurred by the City due to <br />the need for any permits or consents, and shall be responsible for <br />compliance with any other requirements imposed by the agencies in question. <br />4. Development Exhibits. The Developer shall develop the proposed <br />plat in accordance with Exhibit "A ", attached hereto, and on file in the <br />offices of the City; and in accordance with City Council Resolutions <br />No. 96 -5 -118 and 96 -8 -196 adopted on May 22, 1996 and August 28, 1996 <br />respectively. <br />5. Required Improvements. The Developer shall install, at its own <br />expense, the extension of public and private improvements consisting of <br />water main, sanitary sewer main, storm sewer with retention pond, curb and <br />gutter, the first lift of the bituminous roadway, signage, and lighting, <br />all of which will be completed no later than November 15, 1996. The second <br />lift of asphalt for the bituminous roadway is to be completed by Developer <br />no later than August 1, 1997. Original plans and subsequent changes for <br />said improvements shall be prepared by Ken Gust, Registered Engineer, and <br />approved by the City Engineer in accordance with City specifications and <br />standards. It is further understood that the City must approve the <br />contractor who will undertake the installation of the improvements. A copy <br />of Developer's contract with the approved contractor shall be provided to <br />the City. <br />6. Preconstruction Meeting. Prior to the commencement of any work, <br />Developer or its engineer shall schedule a preconstruction meeting to be <br />held at the Little Canada City Hall at a mutually agreeable time. Said <br />-2- <br />Page 129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.