My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-12-06 Council Minutes
>
City Council Meeting Minutes
>
2000-2009
>
2006
>
04-12-06 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 1:31:40 PM
Creation date
4/22/2008 10:14:03 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />APRIL 12, 2006 <br />RESOLUTION NO.2006-4-93 -AWARDING THE LOW BID OF T. A. <br />SCHIFSKY AND SONS IN THE AMOUNT OF $1,754,217.47 FOR <br />2006 IMPROVEMENTS AS RECOMMENDED BY THE CITY <br />ENGINEER <br />The foregoing resolution was duly seconded by LaValle. <br />Ayes (5). <br />Nays (0). Resolution declared adopted. <br />TWIN LAKE Mr. Blesener introduced the following resolution and moved its adoption: <br />BLVD. <br />PROPERTY RESOLUTION NO.2006-4-94 - ORDERING AN APPRAISAL OF <br />APPRAISAL THE CITY'S TWIN LAKE BLVD. PROPERTY AS RECOMMENDED <br />BY THE CITYADMINISTRATOR <br />The foregoing resolution was duly seconded by Allan. <br />Ayes (5). <br />Nays (0). Resolution declared adopted. <br />STORM The City Administrator reported the City Engineer has obtained quotes <br />SEWER for installation of a storm sewer culvert between 2489 and 2481 <br />CULVERT - McMenemy Road to correct a drainage concern. The Administrator <br />2489 & 2481 recommended that action be delayed on awarding the low quote as <br />McMENEMY there is another option that he would like to explore first. This matter <br />ROAD will be brought back to the Council at its next meeting. <br />WATER The Public Works Superintendent reported that the City has budgeted <br />TOWER for the repainting of the water tower for a couple of years. The paint <br />INSPECTION condition appears good; however, the Superintendent recommended that <br />the inside of the water tower be inspected to ensure that the coating <br />condition is as good inside as it is outside. <br />The Superintendent reviewed his report dated April 7, 2006 comparing <br />quotes for this inspection, and recommended the quote of KLM <br />Engineering be awarded in the amount of $2,800. The Superintendent <br />noted that KLM Engineering will use sterilized remote-controlled video <br />equipment to perform the inspection, so there will be no need to empty the <br />tower. KLM Engineering also conducted the last water tower inspection <br />in 1999, therefore, if very familiar with Little Canada's tower. Other <br />quotes were slightly lower; however, the Superintendent noted that these <br />vendors would be using rafts and7or divers and it was the Superintendent's <br />position that the procedures used by KLM would be superior Yo those used <br />by the other vendors. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.