Laserfiche WebLink
-3- <br />As you know, these figures are based on estimates. Actual figures cannot be <br />determined until bids are received. Final cost will be based on actual con- <br />struction. <br />In addition to the above, I believe you have requested Mn /DOT to construct <br />a concrete walk along the south side of Little Canada Road. These costs are <br />not included in this letter but are eligible for municipal state aid funds. * <br />We also discussed the fact that when the project is complete, Little Canada <br />will own the storm sewer trunk system and walkways. <br />Also, you may want to check with the district to see if there are any hidden <br />costs such as mobilization, traffic control, temporary bypass, field labora- <br />tories, etc. <br />Very truly yours, <br />Kenneth E. Weltzin, P.E. <br />Director and County Engineer <br />kew :js <br />Atts: Mn /DOT Memo, 7/30/85 <br />Mn /DOT Estimate, 10/1/84 <br />Mn /DOT Cost Sharing, 6/5/85 <br />CC: Elmer Morris <br />District State Aid Engineer <br />* The District Engineer informed us today, 8 /2 /85,that the <br />estimated cost of the sidewalk is $8,416. <br />2 ' <br />.4. <br />plUM <br />AIIfl 5 1985 <br />CITY OF <br />LITTLE CANADA <br />