My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-09-1977 Council Agenda
>
City Council Packets
>
1975-1979
>
1977
>
11-09-1977 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 1:16:01 PM
Creation date
4/4/2013 9:20:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
300 West Highway 96 <br />St. Paul, Minnesota 35112 <br />4645301 <br />w. <br />Consulting Engineers S p Land Surveyors <br />St PAUL SAUS C[HIS( <br />- MIHH[SOtA �. SE CLOUD <br />City Council <br />Little Canada, MN <br />RE: Payne Ave. from Labore <br />Gentlemen: <br />13 Fourth Avenue S.E. <br />St. Cloud, Minnesota Seel <br />2517731 <br />314 Oak St. <br />Sauk Centre, Minnesota 33271 <br />3525664 <br />Sept. 20, 1977 <br />Road to County Road 0 <br />You of comment on the proposed improvement <br />Road to County Road D. <br />you want me to comment on the street right -of -way inPthiscarea ?y, <br />The existing right -of -way is 33 feet and the width of the tra- <br />velled road is proposed to be 32 feet. Enough right -of -way does <br />not exist to construct a street through this area. Another 33 feet <br />is needed to provide the required right -of -way. The minimum <br />desireable right -of -way is 60 feet. <br />If a 66 foot right -of -way is provided and a 32 foot street is <br />constructed, this means that the boulevard on each side of the <br />street is 17 feet. This 17 feet allows for snow storage, hydrant <br />placement, sign placement, placement of power poles, telephone <br />poles and street light poles, placement of gas lines, underground <br />power lines, and underground telephone lines, and possible future <br />sidewalk construction. For instance, New Brighton has.constructed <br />five miles of sidewalks in the last three years. <br />In my opinion, a new street should not be constructed unless <br />sufficient right -of -way is obtained and the street should be <br />centered in this right -of -way. I understand that an NSP tower <br />exists in the proposed right -of -way. This could be worked out with <br />NSP so that the road would bend around the tower. Drainage is a <br />problem but again, this could be worked out. <br />If the right -of -way is obtained in one section (for instance <br />from County Road D to a point 200 feet south of Allen Ave.) this <br />area of street could be improved providing a temporary cul -de -sac is <br />constructed at the south end. This would be a long dead end street, <br />but it would only be temporary. <br />50 <br />TXLETYNTI <br />SEP 2- 1977 <br />CITY Or <br />LITTLE CANADA <br />
The URL can be used to link to this page
Your browser does not support the video tag.