My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-27-1977 Council Agenda
>
City Council Packets
>
1975-1979
>
1977
>
07-27-1977 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2013 10:42:57 AM
Creation date
4/4/2013 10:42:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LITTLE CANADA IMPR. 76 -1 <br />IMPROVEMENT: <br />LOCATION: <br />INITIATION: <br />STATUS OF PLANS: <br />FEASIBILITY: <br />COMPLETION: <br />REMARKS: <br />FINANCING: <br />FEASIBILITY REPORT <br />WATER SUPPLY SYSTEM <br />This improvement includes the installation of 24" & 16" trunk <br />watermains, booster pump station, elevated tank and misc. <br />service connections. <br />The general location of the improvement is as follows: The <br />booster pump shall be located near the intersection of the <br />Soo Line R.R. and Co. Rd. "B ". The elevated tank shall be <br />located in the area of Desota St. and Allen Ave. The trunk <br />lines shall be installed from the St. Paul Water Department <br />property located near Roselawn to Allen Avenue, generally <br />aligned with the Soo Line R.R., McMenemy St. & Desoto St. <br />City Council <br />Reports, preliminary maps and sketch plan. <br />This project is feasible. <br />If started during 1977, this project could be completed by <br />the early part of 1979. <br />This report includes a cost comparison of the 16" trunk line <br />located in Desoto or Vanderbie Streets. The trunk location on <br />Vanderbie could be used to serve the existing homes. <br />Cost estimates. <br />! <br />P 1 an #2 i .X7/. <br />Construction <br />Contingency <br />$1,656,800.00 <br />165,700.00 <br />Legal 27,300.00 <br />Fiscal 27,300.00 <br />Administration 18,200.00- <br />Land Acquisition 50,000.00 <br />Engineering 182,200.00 <br />TOTAL $2,127,500.00 <br />Capital Interest (8 %) 170,200.00 <br />$2,297,700.00 <br />Plan #1 <br />Construction $1,620,000.00 <br />Contingency 162,000.00 <br />Legal 27,000.00 <br />Fiscal 27,000.00 <br />Administration 18,000.00 <br />Land Acquisition 50,000.00 <br />Engineering 178,200.00 <br />TOTAL $2,x82,200.00 <br />Capital Interest (8 &) 166,600.00 <br />$2,248,800.00 <br />0014 <br />1070 <br />
The URL can be used to link to this page
Your browser does not support the video tag.