My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-1977 Council Agenda
>
City Council Packets
>
1975-1979
>
1977
>
03-09-1977 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2013 3:19:58 PM
Creation date
4/4/2013 3:18:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. SERVICES BY OTHERS <br />This includes all time spent by the Engineer in advising the Owner <br />and supervising such tasks done by others as the Owner may request <br />or the Engineer may recommend, when authorized by resolution in <br />writing. Such work includes: soil borings and analysis, chemical <br />tests, material tests and other tasks requiring specialized equipment <br />or skills. The advice and supervision by the Engineer shall be pairs <br />for at the hourly rates noted above; payment for the actual tasks <br />performed by others shall be paid directly to those persons or ., <br />performing said tasks and not through the Engineer. <br />G. PUBLIC MEETINGS <br />When the Owner requests that the Engineer have a representative at <br />a meeting (specific or all) for advice and Council in general (nc-, <br />for a specific project) the Owner shall pay the Engineer forty <br />($40.00) dollars as full compensation for such time spent at each <br />meeting attended. <br />H. MISCELLANEOUS <br />This includes all time spent by the Engineer in work not otherwise <br />covered above in which the Owner requires Engineering assistance. <br />This would include plans and specifications not otherwise covered <br />by Section I of this agreement and investigations or studies of <br />complaints or special conditions where the Owner determines that the <br />Engineer's experience would be useful. <br />This also includes all time spent by the Engineer in Rebidding a <br />project under Section I, if the Rebid is required by circumstance <br />beyond the control of the Engineer. <br />-5- <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.