My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-1978 Council Agenda
>
City Council Packets
>
1975-1979
>
1978
>
09-13-1978 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 1:35:00 PM
Creation date
4/8/2013 11:07:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
600 West Highway 96 <br />St. Paul, Minnesota 55112 <br />484 -3301 <br />ASSOCIATE <br />Consulting Engineers — Land Surveyors <br />IT. PAUL SAUS CENTRE SCCLOUD <br />.- MINNISOIA - <br />Centennial Contractors Corp. <br />70 West County Road C <br />Little Canada, MN 55117 <br />Attention: Mr. Vernon Tebben <br />18 Fourth Avenue S.E. <br />St. Cloud, Minnesota 56301 <br />251.7761 <br />314 Oak St. <br />Sauk Centre, Minnesota SL378 <br />352.3664 <br />Aug. 21, 1978 <br />Dear Mr. Tebben: <br />We had hoped that, following our meeting of August 8, we <br />would receive the cooperation which you promised. <br />However, such is not the case. We are listing herewith specific <br />items most of which have been given to you verbally but which you <br />appear to be ignoring. <br />1. Trespassing on private property and destroying property corners. <br />The replacing of these corners will be charged to you. <br />2 Dirt, rocks and other debris has not been cleaned from <br />private property. <br />3. Boulevards have not'been <br />4. Scraping and breaking of tree limbs along the operation <br />must stop. <br />5. Material being broughtin (a pay item) without authority of the <br />Engineer will not be paid for. This holds true for Class II <br />and pitrun material. <br />6. Trees and shrubbery in Southern Slopes Addition must be removed. <br />7. Streets in Southern Slopes Addition must be graded before <br />any further utility work takes place. <br />8. Conductivity test must be made before bituminous overlay is <br />installed. <br />raked as work progresses. <br />9. Sodding and seeding of areas where work has been completed should <br />be started immediately. <br />058 <br />or <br />
The URL can be used to link to this page
Your browser does not support the video tag.