Laserfiche WebLink
City Council August 5, 1976 <br />City" of Little Canada <br />RE: <br />TEM <br />FINAL ESTIMATE <br />Sevier, Water, Street Impr. 75 -4 <br />Contractor: Ro -So Contracting, Inc <br />l' Trees, Clearing & Grubbing 25 Each 61.50 1,537.50 <br />2. Excavation 7,801.Cu.'!Yd. 0.60 4,680.60 <br />3. .Muck Excavation 717 Cu. Yd. 1.65 1,183.05 <br />4. Aggregate Base 2,759 Sq. Yd. 1.73 4,773.07 <br />6 ;Bituminous Surface 2,759 Sq. Yd. 1.93 5,324.87 <br />7` "Plant Mix Machine Laid <br />Curb 1,520 Lin. Ft. 0.79 1,200.80 <br />8 " Topsoil, Seed & Mulch. 7,437 Sq. Yd. 0.47 3,495.39 <br />Bituminous Spillway 2 Each 71.50 143.00 <br />10 22 "x 13" CMP Arch & Aprons 68 Lin., Ft. 11.15 758.20 <br />L4ATERMAIN QUANTITIES <br />1 -DIP klatermain <br />2. 6.x 6 CIP Tees <br />3. 6 " Gate .Valve & Box <br />4. , 6" CIP Plugs <br />5. Hydrants <br />6. 6" DIP Hydrant Connection <br />7. 1" Copper House Service <br />SANITARY SEWER QUANTITIES <br />1. 8" VCP Extra Strength <br />2. 6" VCP Extra Strength Hse. Ser. <br />3. Standard Manhole <br />4.'' 8 x 6 VCP Tee <br />5. Manhole Frame & Cover <br />6., Crushed Rock Trench Stabiliz. <br />652 Lin. Ft. 7.60 4,955.20 <br />3 Each 88,30 264.90 <br />3 Each 200.00 600.00 <br />2 Each 24.00 48.00 <br />3 Each 535.00 1,605.00° <br />30 Lin. Ft. 9.50 285.00 <br />9 Each 165.60 1,490.40 <br />655 Lin. Ft. <br />301 Lin. Ft. <br />30 Lin. Ft. <br />9 Each <br />3 Each <br />211 T ®n <br />9.25 - <br />5.00 <br />56.25 <br />17.70 <br />115.00 <br />4.75 <br />6,058.75 <br />1,505.00'' <br />1,687.50 <br />159.30 <br />345.00 <br />1,002.25; <br />TOTAL VALUE OF WORK TO DATE.$43,102.78.: <br />Less Previous Estimates. 35,646.65 <br />AMOUNT DUE THIS FINAL EST. .$ 7,456:13 <br />APPROVED: MILNER R. CARLEY & ASSOCIATES <br />BY ;,, . -n (.? Af1 /f <br />0019 <br />