My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-08-1979 Council Agenda
>
City Council Packets
>
1975-1979
>
1979
>
08-08-1979 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 1:37:20 PM
Creation date
4/23/2013 1:36:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATED COSTS TO INSTALL OVERHEAD FLASHER <br />45' Wood Pole $440.00 each 2 $ 880.00 <br />Down Guy & Anchor 80.00 each 2 160.00 <br />716" Span Wire 0.60 L.F. 200 120.00 <br />12" Signal Indication 70.00 each 4 280.00 <br />1 *" R.S.C. 2.00 L.F. 4o 80.00 <br />1 " Weather Head 50.00 each 2 100.00 <br />Cabinet 100.00 1 100.00 <br />Flasher Unit 150.00 1 150.00 <br />Service Equipment 80.00 1 80.00 <br />Operating Costs <br />TOTAL $1,950.00 <br />10% 195.00 <br />$2,145.00 <br />$150/year <br />1E <br />
The URL can be used to link to this page
Your browser does not support the video tag.