Laserfiche WebLink
-2- <br />C. Provide shouldering work an both sides of County Road C from <br />Jackson Street to Demont Avenue. <br />D. Place topsoil and sod on the east edge of Jackson Street <br />from 2590 address to Lake Street. Construct a small berm <br />around radius on north side of Lake Street at the intersection. <br />Repair culvert end at same location. <br />E. Place rock spillway at north side of south driveway at south- <br />east corner of Jackson Street and Lake Street. <br />3. County Road C (County Road No. 21) from new County Road C to Soo <br />Line Railroad tracks. <br />A. No work required. <br />4. Paint centerline striping on all roadways reviewed. <br />MDK/clm <br />cc: George Gotwald, Carley Engineering <br />\adiebert DeBace, Councilman, City of Little Canada <br />TA <br />18 <br />