Laserfiche WebLink
CHANGE OR UORK ORDER ;10. <br />PROJECT Water Booster Station DATE <br />1 -11 -80 <br />PROJECT NO. 77 -420 LOCATION Little Canada <br />CONTRACTOR: Gridor Construction OWNER City of Little Cana <br />NATURE OF CHANGE OR ADDITION <br />Description and Coat: <br />Additional cost for changing of control panel <br />Total cost of labor, equipment and installation - $608.00 <br />Is Cost Actual or Estimated? ACTUAL <br />This authorizes the Contractor to perform this work as part of the <br />Base Contract when signed by all parties. <br />Approved by Engineer: <br />MILNER WJCnCARLEY & ASSOCIATES <br />BY 14(4a At4/ <br />S <br />Agreed to by Contractor <br />By <br />By <br />By <br />Superintendent of Foreman <br />Approved by Owner: <br />75 <br />