Laserfiche WebLink
Proposed Pee Schedule for Electrical Permits <br />(a) Minimum fee for each separate inspection of an install- <br />ation, replacement, alteration or repair limited to one inspect- <br />ion only $6 7-99 *8.00 <br />(b) Services, changes of service, temporary services, <br />additions, alterations, or repairs on either primary or second- <br />ary services shall be computed separately. <br />0 to 100 ampere capacity $10700 t111.212 <br />101 to and including 200 ampere capacity *12,-99 ,,516.00 <br />For each additional 100 ampere capacity or fraction <br />thereof... t5•99 t7.00 <br />(c) Circuit, installations of, additions, alterations <br />or repairs of each circuit or sub - feeder shall be computed <br />separately, including circuits fed from sub - feeders and <br />including the equipment served, except as provided for in <br />items (d) through (j). <br />0 to and including 30 ampere capacity ....... $2T59 $3.25 <br />(maximum number of 0 to 30 ampere circuits to be paid <br />on is 30 to any one cabinet). <br />31 to and including 100 ampere capacity $4 ,-99 $5.00 <br />For each additional 100 ampere capacity or fraction <br />thereof... ............ $2T99 t2.K0 <br />(d) Maximum fee on a single family dwelling shall not <br />exceed $46,-90 $50.00 if not over 200 ampere capacity. This <br />includes service, feeders, circuits, fixtures and wquipment. <br />The maximum fee provides for not more than two rough -in <br />inspections at the re- inspection rate. <br />(e) Maximum fee on an apartment building shall not exceed <br />$291-06 $25.00 per dwelling unit for the first 20 units and $154-09 <br />$20.00 per dwelling unit for the balance of the units. A two - <br />unit dwelling, (duplex) maximum fee per unit as per single <br />family dwelling. <br />(f) The maximum number of 0 to 30 ampere circuits to be <br />paid on any one Athletic Field lighting standard is ten. <br />(g) In addition to the above fees: <br />(1) A charge of $1.00 will be made for each street lighting <br />standard. <br />(2) A charge of $2.00 will be made for each traffic signal <br />standard. Circuits originating within the standard will not be <br />used when computing fees. <br />(h) In addition to the above fees, all transformers and <br />generators for light, heat and power shall be computed separately <br />at $3..09 $4.00 per unit plus 150 200 per KVA up to and including <br />100 KVA. 101 KVA and over at 190 11¢ per KVA. The maximum fee for <br />any transformer or generator in this category is $30,-90 $40.00. <br />-1- <br />