Laserfiche WebLink
General: <br />Proposal is based on performing work during normal business hours <br />• All cabling and components will be installed with adherence to ANSI /EIA /TIA 568 (revision A)- <br />"Commercial Building Telecommunications Wiring & Fiber Standard?, TIA /EIA TSB75 — "Additional <br />Horizontal Cabling Practices for Open Offices ", as well as all applicable electrical, building and fire <br />protection codes. <br />• Installation crew will conduct themselves in a professional manner and cooperate with the General <br />Contractor and other trades in the interest of a safe, timely, successful project <br />• Workmanship will be at the highest level of the trade <br />• Provide test results. <br />Financial Summary <br />MTG shall provide the design, materials, tools, labor and project management to perform the services as <br />requested by customer and as described in this proposal. <br />Labor & Materials $ 2,905.00 <br />Authorization to Proceed <br />By signing this Authorization to Proceed, customer agrees to the above scope of work and pricing and authorizes Master <br />Technology Group, Inc. to proceed with the project as proposed. <br />Date: <br />Customer Signature <br />Customer Purchase Order <br />We appreciate this opportunity. Please contact me with any questions. <br />Rod Spahn <br />Project Manager <br />952- 808 -3442 (desk) <br />952 -451 -8622 (cell) <br />Rod.Spahn(4),calhntg.com <br />Page 2 of 2 <br />3 <br />