My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-1987 Council Agenda
>
City Council Packets
>
1980-1989
>
1987
>
06-10-1987 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2013 2:25:17 PM
Creation date
5/7/2013 2:24:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
contamination of any one of the four materials by the ether <br />materials must be less than an aggregate amount of 10`1 by weight.. <br />For example, green glass may be contaminated by a maximum of 1n <br />of brown glass, clear glass and metals taken together. Any one <br />material must contain less than 5% by weight of foreign <br />contaminants. Foreign contaminants include paper, garbage, and <br />materials not normally processed by the Recycling Center (window <br />glass, etc.). At Super Cycle's option, loads which exceed the <br />cross - contamination or foreign contamination specifications may <br />be cleaned up by the City Contractor or may be rejected <br />altogether. Also at Super Cycle's option, this clean -up may take <br />place at the Recycling Center, or the City Contractor may have to <br />take the load elsewhere for cleaning and then bring the materials <br />back. Super Cycle shall notify a County solid waste staff person <br />as soon as possible of any incidents concerning deliveries of <br />contaminated or off - specification loads. <br />The City Contractor shall deliver materials in such a manner that <br />they may be unloaded using a forklift with standard attachments <br />or by dumping into bins which are approximately 4 feet high by 4 <br />feet wide by 4 feet long. The City Contractor shall unload only <br />where directed to do so by Super Cycle. Where assistance from <br />Super Cycle employees is necessary (such as for operating a <br />forklift or arranging bins), Super Cycle shall give assistance in <br />a timely fashion and complete the unloading the same day as long <br />as the City Contractor arrived at the Recycling Center by 6:00 <br />p.m. In giving assistance, Super Cycle shall take the City <br />Contractor's vehicles on a first -come, first -serve basis and <br />treat those vehicles on an equal basis as Super Cycle's own <br />vehicles. Total time for unloading cannot be specified as it is <br />dependent on the amount of materials and manner in which they are <br />delivered, but unloading time shall be kept within reasonable <br />bounds by Super Cycle unless there are circumstances beyond their <br />control. Conversely, City Contractors shall not linger <br />unnecessarily at the Recycling Center, nor shall they enter areas <br />of the property without just cause. <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.