Laserfiche WebLink
Spec. <br />Item <br />No. Work Item <br />0104.607 <br />2211.503 <br />2521.501 <br />2521.511 <br />2531.501 <br />Sch. "P" <br />Sch. "I" <br />SCHEDULE "J" Agreement 87022 <br />S.A.P. 200 - 020-01 <br />Haul Salvaged Material <br />Aggregate Base Placed Cl. 5 <br />4" Concrete Walk <br />3" Bituminous Walk <br />Concrete C & G DES B624 <br />S.A.P. 62- 621 -03 Storm Sewer <br />Bridge 62896 <br />Sch. "1" Prorata Share' ($146,701.00) <br />Sch. "P" Construction Engineering <br />(Est. 8 %) <br />SCHED .1 <br />Unit <br />L.S. <br />C.Y. <br />S.F. <br />S.F. <br />L.F. <br />L.S. <br />L.S. <br />Unit <br />Price <br />1,200.00 <br />14.00 <br />1.70 <br />1.20 <br />7.00 <br />58,864.65 <br />1,053,803.60 <br />L.S. Sub Total A <br />L.S. Sub Total B <br />Quantity <br />100% <br />34 <br />2,312 <br />330 <br />1,282 <br />0.257 <br />0.00551494 <br />Sub Total A <br />0.06086441 <br />Sub Total B <br />0.08 <br />Total S.A.P. 200-020-01 <br />SUMMARY: <br />Little Canada Total <br />S.A.P. 200 -103 -01 <br />S.A.P. 200 -020 -01 <br />Total <br />2 of 2 <br />Page 101 <br />$11,029.52 <br />41.150.48 <br />$52,180.00 A. <br />Cost <br />Estimate <br />$ 1,200.00 <br />476.00 <br />3,930.40 <br />396.00 <br />8,974.00 <br />15,128.22 <br />5,811.66 <br />$35,916.28 <br />2,186.02 <br />$38,102.30 <br />3,048.18 <br />$41,150.48 <br />